{"$schema":"https://wellknown.network/schemas/agent-record-v1.json","schemaVersion":"1","id":"ag_udbeabxqhpad","handle":"watt-street-us-grid-and-interconnection-queue-da","url":"https://wellknown.network/agents/watt-street-us-grid-and-interconnection-queue-da","links":{"self":"https://wellknown.network/agents/watt-street-us-grid-and-interconnection-queue-da/record.json","html":"https://wellknown.network/agents/watt-street-us-grid-and-interconnection-queue-da","markdown":"https://wellknown.network/agents/watt-street-us-grid-and-interconnection-queue-da/record.md","api":"https://wellknown.network/api/v1/agents/watt-street-us-grid-and-interconnection-queue-da","status":"https://wellknown.network/api/v1/agents/watt-street-us-grid-and-interconnection-queue-da/status","claim":"https://wellknown.network/agents/watt-street-us-grid-and-interconnection-queue-da/claim","claimApi":"https://wellknown.network/api/v1/claims","claimDescriptor":"https://wellknown.network/agents/watt-street-us-grid-and-interconnection-queue-da/claim.json","badge":"https://wellknown.network/agents/watt-street-us-grid-and-interconnection-queue-da/badge.svg","openapi":"https://wellknown.network/openapi.json","history":"https://wellknown.network/api/v1/agents/watt-street-us-grid-and-interconnection-queue-da/history","tools":"https://wellknown.network/api/v1/agents/watt-street-us-grid-and-interconnection-queue-da/tools"},"ard":{"identifier":"urn:air:api.wattstreet.net:server:watt-street-us-grid-and-interconnection-queue-da","type":"application/mcp-server-card+json"},"kind":"mcp_server","declared":{"name":"Watt Street — US grid, interconnection queue and data center power","summary":"How long to get grid power in any US county. 39,173 filings, 1,574 counties, dated sources.","description":"How long to get grid power in any US county. 39,173 filings, 1,574 counties, dated sources.","publisher":{"name":"net.wattstreet","url":null},"homepage":"https://wattstreet.net","repository":null,"version":"1.2.0","license":null,"protocols":["mcp"],"tags":[],"pricing":null,"endpoints":[{"url":"https://api.wattstreet.net/mcp","type":"mcp_streamable_http","auth":null,"probeable":true}],"skills":null,"tools":null,"extra":{"updatedAt":"2026-09-08T17:33:24.485355Z","publishedAt":"2026-09-08T17:33:24.485355Z","registryName":"net.wattstreet/grid"},"attribution":{"kind":"mcp_registry","name":"mcp_registry","summary":"mcp_registry","version":"mcp_registry","description":"mcp_registry","homepageUrl":"mcp_registry","publisherName":"mcp_registry"}},"derived":{"capabilities":[{"slug":"research.academic","name":"Academic Research","confidence":0.54,"provenance":"derived"}],"categories":["research"],"language":"en"},"observed":{"status":"live","statusReason":"Responded 32m ago.","lastOkAt":"2026-10-10T08:31:37.020Z","lastProbedAt":"2026-10-10T08:31:37.020Z","statusComputedAt":"2026-10-10T08:34:01.385Z","reliability30d":{"probes":110,"successRate":1,"p50Ms":20,"basis":"service","measures":{"availability":"availability","latency":"response time","tools":"tool surface observed","summary":"Checks reached the service itself."},"checks":{"total":109,"ok":109,"authBoundaryOk":0,"serviceOk":109,"note":"Counted from the observation rows for the window, checks of the server only (HTTP, A2A card, MCP initialize). ok = authBoundaryOk + serviceOk. `probes` is the sum of daily rollups and includes registry checks, so it can differ from `total`."}},"latestObservations":[{"at":"2026-10-10T08:31:37.020Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":10,"error":null,"detail":{"tools":[{"name":"search_projects","description":"Search 39,173 US grid connection applications by region, status, fuel, state or size. Returns project rows with MW, county, wait time and outcome."},{"name":"county_profile","description":"Full grid intelligence for one US county: queued MW, connected capacity, project count, median wait, lead technology."},{"name":"load_ledger","description":"Large-load connection requests — requests to connect big new DEMAND to the US grid. 528 requests on file from BPA and NYISO only; 494 state no end use, so most "},{"name":"map_data","description":"GeoJSON FeatureCollection of grid activity for rendering a map: generation queue by county, data-center power requests, and AI campuses."},{"name":"policy_events","description":"Tracked policy events — data-center moratoria, large-load tariffs, FERC and state dockets — with direction (opening/closing) and citations."},{"name":"interconnection_deadlines","description":"Cluster request windows, filing deadlines and compliance dates for US interconnection queues, with days remaining. Every date carries its source and how well it"},{"name":"account_status","description":"Credits remaining on the calling key, and how to top up without a human."}],"toolCount":7,"toolsHash":"b125e973f6b76a9b6bd93a1fb2c600e3352dcbf31ae04483bb3d42cc4cf58578","serverName":"watt-street","capabilities":["tools"],"serverVersion":"1.0.0","protocolVersion":"2026-07-28"}},{"at":"2026-10-10T01:24:03.088Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":33,"error":null,"detail":{"tools":[{"name":"search_projects","description":"Search 39,173 US grid connection applications by region, status, fuel, state or size. Returns project rows with MW, county, wait time and outcome."},{"name":"county_profile","description":"Full grid intelligence for one US county: queued MW, connected capacity, project count, median wait, lead technology."},{"name":"load_ledger","description":"Large-load connection requests — requests to connect big new DEMAND to the US grid. 528 requests on file from BPA and NYISO only; 494 state no end use, so most "},{"name":"map_data","description":"GeoJSON FeatureCollection of grid activity for rendering a map: generation queue by county, data-center power requests, and AI campuses."},{"name":"policy_events","description":"Tracked policy events — data-center moratoria, large-load tariffs, FERC and state dockets — with direction (opening/closing) and citations."},{"name":"interconnection_deadlines","description":"Cluster request windows, filing deadlines and compliance dates for US interconnection queues, with days remaining. Every date carries its source and how well it"},{"name":"account_status","description":"Credits remaining on the calling key, and how to top up without a human."}],"toolCount":7,"toolsHash":"b125e973f6b76a9b6bd93a1fb2c600e3352dcbf31ae04483bb3d42cc4cf58578","serverName":"watt-street","capabilities":["tools"],"serverVersion":"1.0.0","protocolVersion":"2026-07-28"}},{"at":"2026-10-09T18:25:52.295Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":114,"error":null,"detail":{"tools":[{"name":"search_projects","description":"Search 39,173 US grid connection applications by region, status, fuel, state or size. Returns project rows with MW, county, wait time and outcome."},{"name":"county_profile","description":"Full grid intelligence for one US county: queued MW, connected capacity, project count, median wait, lead technology."},{"name":"load_ledger","description":"Large-load connection requests — requests to connect big new DEMAND to the US grid. 528 requests on file from BPA and NYISO only; 494 state no end use, so most "},{"name":"map_data","description":"GeoJSON FeatureCollection of grid activity for rendering a map: generation queue by county, data-center power requests, and AI campuses."},{"name":"policy_events","description":"Tracked policy events — data-center moratoria, large-load tariffs, FERC and state dockets — with direction (opening/closing) and citations."},{"name":"interconnection_deadlines","description":"Cluster request windows, filing deadlines and compliance dates for US interconnection queues, with days remaining. Every date carries its source and how well it"},{"name":"account_status","description":"Credits remaining on the calling key, and how to top up without a human."}],"toolCount":7,"toolsHash":"b125e973f6b76a9b6bd93a1fb2c600e3352dcbf31ae04483bb3d42cc4cf58578","serverName":"watt-street","capabilities":["tools"],"serverVersion":"1.0.0","protocolVersion":"2026-07-28"}},{"at":"2026-10-09T11:27:39.689Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":13,"error":null,"detail":{"tools":[{"name":"search_projects","description":"Search 39,173 US grid connection applications by region, status, fuel, state or size. Returns project rows with MW, county, wait time and outcome."},{"name":"county_profile","description":"Full grid intelligence for one US county: queued MW, connected capacity, project count, median wait, lead technology."},{"name":"load_ledger","description":"Large-load connection requests — requests to connect big new DEMAND to the US grid. 528 requests on file from BPA and NYISO only; 494 state no end use, so most "},{"name":"map_data","description":"GeoJSON FeatureCollection of grid activity for rendering a map: generation queue by county, data-center power requests, and AI campuses."},{"name":"policy_events","description":"Tracked policy events — data-center moratoria, large-load tariffs, FERC and state dockets — with direction (opening/closing) and citations."},{"name":"interconnection_deadlines","description":"Cluster request windows, filing deadlines and compliance dates for US interconnection queues, with days remaining. Every date carries its source and how well it"},{"name":"account_status","description":"Credits remaining on the calling key, and how to top up without a human."}],"toolCount":7,"toolsHash":"b125e973f6b76a9b6bd93a1fb2c600e3352dcbf31ae04483bb3d42cc4cf58578","serverName":"watt-street","capabilities":["tools"],"serverVersion":"1.0.0","protocolVersion":"2026-07-28"}},{"at":"2026-10-09T05:26:20.121Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":9,"error":null,"detail":{"tools":[{"name":"search_projects","description":"Search 39,173 US grid connection applications by region, status, fuel, state or size. Returns project rows with MW, county, wait time and outcome."},{"name":"county_profile","description":"Full grid intelligence for one US county: queued MW, connected capacity, project count, median wait, lead technology."},{"name":"load_ledger","description":"Large-load connection requests — requests to connect big new DEMAND to the US grid. 528 requests on file from BPA and NYISO only; 494 state no end use, so most "},{"name":"map_data","description":"GeoJSON FeatureCollection of grid activity for rendering a map: generation queue by county, data-center power requests, and AI campuses."},{"name":"policy_events","description":"Tracked policy events — data-center moratoria, large-load tariffs, FERC and state dockets — with direction (opening/closing) and citations."},{"name":"interconnection_deadlines","description":"Cluster request windows, filing deadlines and compliance dates for US interconnection queues, with days remaining. Every date carries its source and how well it"},{"name":"account_status","description":"Credits remaining on the calling key, and how to top up without a human."}],"toolCount":7,"toolsHash":"b125e973f6b76a9b6bd93a1fb2c600e3352dcbf31ae04483bb3d42cc4cf58578","serverName":"watt-street","capabilities":["tools"],"serverVersion":"1.0.0","protocolVersion":"2026-07-28"}},{"at":"2026-10-08T23:21:51.470Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":14,"error":null,"detail":{"tools":[{"name":"search_projects","description":"Search 39,173 US grid connection applications by region, status, fuel, state or size. Returns project rows with MW, county, wait time and outcome."},{"name":"county_profile","description":"Full grid intelligence for one US county: queued MW, connected capacity, project count, median wait, lead technology."},{"name":"load_ledger","description":"Large-load connection requests — requests to connect big new DEMAND to the US grid. 528 requests on file from BPA and NYISO only; 494 state no end use, so most "},{"name":"map_data","description":"GeoJSON FeatureCollection of grid activity for rendering a map: generation queue by county, data-center power requests, and AI campuses."},{"name":"policy_events","description":"Tracked policy events — data-center moratoria, large-load tariffs, FERC and state dockets — with direction (opening/closing) and citations."},{"name":"interconnection_deadlines","description":"Cluster request windows, filing deadlines and compliance dates for US interconnection queues, with days remaining. Every date carries its source and how well it"},{"name":"account_status","description":"Credits remaining on the calling key, and how to top up without a human."}],"toolCount":7,"toolsHash":"b125e973f6b76a9b6bd93a1fb2c600e3352dcbf31ae04483bb3d42cc4cf58578","serverName":"watt-street","capabilities":["tools"],"serverVersion":"1.0.0","protocolVersion":"2026-07-28"}},{"at":"2026-10-08T16:28:38.157Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":54,"error":null,"detail":{"tools":[{"name":"search_projects","description":"Search 39,173 US grid connection applications by region, status, fuel, state or size. Returns project rows with MW, county, wait time and outcome."},{"name":"county_profile","description":"Full grid intelligence for one US county: queued MW, connected capacity, project count, median wait, lead technology."},{"name":"load_ledger","description":"Large-load connection requests — requests to connect big new DEMAND to the US grid. 528 requests on file from BPA and NYISO only; 494 state no end use, so most "},{"name":"map_data","description":"GeoJSON FeatureCollection of grid activity for rendering a map: generation queue by county, data-center power requests, and AI campuses."},{"name":"policy_events","description":"Tracked policy events — data-center moratoria, large-load tariffs, FERC and state dockets — with direction (opening/closing) and citations."},{"name":"interconnection_deadlines","description":"Cluster request windows, filing deadlines and compliance dates for US interconnection queues, with days remaining. Every date carries its source and how well it"},{"name":"account_status","description":"Credits remaining on the calling key, and how to top up without a human."}],"toolCount":7,"toolsHash":"b125e973f6b76a9b6bd93a1fb2c600e3352dcbf31ae04483bb3d42cc4cf58578","serverName":"watt-street","capabilities":["tools"],"serverVersion":"1.0.0","protocolVersion":"2026-07-28"}},{"at":"2026-10-08T10:24:06.055Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":16,"error":null,"detail":{"tools":[{"name":"search_projects","description":"Search 39,173 US grid connection applications by region, status, fuel, state or size. Returns project rows with MW, county, wait time and outcome."},{"name":"county_profile","description":"Full grid intelligence for one US county: queued MW, connected capacity, project count, median wait, lead technology."},{"name":"load_ledger","description":"Large-load connection requests — requests to connect big new DEMAND to the US grid. 528 requests on file from BPA and NYISO only; 494 state no end use, so most "},{"name":"map_data","description":"GeoJSON FeatureCollection of grid activity for rendering a map: generation queue by county, data-center power requests, and AI campuses."},{"name":"policy_events","description":"Tracked policy events — data-center moratoria, large-load tariffs, FERC and state dockets — with direction (opening/closing) and citations."},{"name":"interconnection_deadlines","description":"Cluster request windows, filing deadlines and compliance dates for US interconnection queues, with days remaining. Every date carries its source and how well it"},{"name":"account_status","description":"Credits remaining on the calling key, and how to top up without a human."}],"toolCount":7,"toolsHash":"b125e973f6b76a9b6bd93a1fb2c600e3352dcbf31ae04483bb3d42cc4cf58578","serverName":"watt-street","capabilities":["tools"],"serverVersion":"1.0.0","protocolVersion":"2026-07-28"}},{"at":"2026-10-08T04:24:57.256Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":14,"error":null,"detail":{"tools":[{"name":"search_projects","description":"Search 39,173 US grid connection applications by region, status, fuel, state or size. Returns project rows with MW, county, wait time and outcome."},{"name":"county_profile","description":"Full grid intelligence for one US county: queued MW, connected capacity, project count, median wait, lead technology."},{"name":"load_ledger","description":"Large-load connection requests — requests to connect big new DEMAND to the US grid. 528 requests on file from BPA and NYISO only; 494 state no end use, so most "},{"name":"map_data","description":"GeoJSON FeatureCollection of grid activity for rendering a map: generation queue by county, data-center power requests, and AI campuses."},{"name":"policy_events","description":"Tracked policy events — data-center moratoria, large-load tariffs, FERC and state dockets — with direction (opening/closing) and citations."},{"name":"interconnection_deadlines","description":"Cluster request windows, filing deadlines and compliance dates for US interconnection queues, with days remaining. Every date carries its source and how well it"},{"name":"account_status","description":"Credits remaining on the calling key, and how to top up without a human."}],"toolCount":7,"toolsHash":"b125e973f6b76a9b6bd93a1fb2c600e3352dcbf31ae04483bb3d42cc4cf58578","serverName":"watt-street","capabilities":["tools"],"serverVersion":"1.0.0","protocolVersion":"2026-07-28"}},{"at":"2026-10-07T21:29:03.933Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":11,"error":null,"detail":{"tools":[{"name":"search_projects","description":"Search 39,173 US grid connection applications by region, status, fuel, state or size. Returns project rows with MW, county, wait time and outcome."},{"name":"county_profile","description":"Full grid intelligence for one US county: queued MW, connected capacity, project count, median wait, lead technology."},{"name":"load_ledger","description":"Large-load connection requests — requests to connect big new DEMAND to the US grid. 528 requests on file from BPA and NYISO only; 494 state no end use, so most "},{"name":"map_data","description":"GeoJSON FeatureCollection of grid activity for rendering a map: generation queue by county, data-center power requests, and AI campuses."},{"name":"policy_events","description":"Tracked policy events — data-center moratoria, large-load tariffs, FERC and state dockets — with direction (opening/closing) and citations."},{"name":"interconnection_deadlines","description":"Cluster request windows, filing deadlines and compliance dates for US interconnection queues, with days remaining. Every date carries its source and how well it"},{"name":"account_status","description":"Credits remaining on the calling key, and how to top up without a human."}],"toolCount":7,"toolsHash":"b125e973f6b76a9b6bd93a1fb2c600e3352dcbf31ae04483bb3d42cc4cf58578","serverName":"watt-street","capabilities":["tools"],"serverVersion":"1.0.0","protocolVersion":"2026-07-28"}}],"tools":[{"name":"search_projects","description":"Search 39,173 US grid connection applications by region, status, fuel, state or size. Returns project rows with MW, county, wait time and outcome."},{"name":"county_profile","description":"Full grid intelligence for one US county: queued MW, connected capacity, project count, median wait, lead technology."},{"name":"load_ledger","description":"Large-load connection requests — requests to connect big new DEMAND to the US grid. 528 requests on file from BPA and NYISO only; 494 state no end use, so most "},{"name":"map_data","description":"GeoJSON FeatureCollection of grid activity for rendering a map: generation queue by county, data-center power requests, and AI campuses."},{"name":"policy_events","description":"Tracked policy events — data-center moratoria, large-load tariffs, FERC and state dockets — with direction (opening/closing) and citations."},{"name":"interconnection_deadlines","description":"Cluster request windows, filing deadlines and compliance dates for US interconnection queues, with days remaining. Every date carries its source and how well it"},{"name":"account_status","description":"Credits remaining on the calling key, and how to top up without a human."}],"package":null,"toolSurface":{"id":"ts_xyajezjx9vaf","endpointId":"ep_4nc32g873xz7","hash":"b125e973f6b76a9b6bd93a1fb2c600e3352dcbf31ae04483bb3d42cc4cf58578","toolCount":7,"serverName":"watt-street","serverVersion":"1.0.0","protocolVersion":"2026-07-28","firstSeenAt":"2026-09-12T13:26:15.599Z","lastSeenAt":"2026-10-10T08:31:37.016Z","observations":102,"toolNames":["search_projects","county_profile","load_ledger","map_data","policy_events","interconnection_deadlines","account_status"],"distinctSurfaces":1},"endpointFacts":[{"id":"ep_4nc32g873xz7","url":"https://api.wattstreet.net/mcp","type":"mcp_streamable_http","factsCheckedAt":"2026-10-10T01:24:03.109Z","auth":{"observedAt":"2026-10-10T01:24:03.137Z","authRequired":false,"scheme":null,"resourceMetadata":null,"authorizationServer":null,"conformance":{"dpop":false,"rfc8414":false,"rfc9728":false,"pkceS256":false,"clientIdMetadataDocument":false,"dynamicClientRegistration":false}},"tls":{"observedAt":"2026-10-10T01:24:03.147Z","protocol":"TLSv1.3","chainValid":true,"chainError":null,"hostMatches":true,"subject":"wattstreet.net","issuer":{"commonName":"WE1","organization":"Google Trust Services"},"validFrom":"2026-08-16T17:50:27.000Z","validTo":"2026-11-14T18:48:07.000Z","daysToExpiry":35,"sanCount":2,"fingerprint256":"60:DB:22:54:43:68:25:FE:8E:5D:94:8D:2E:39:49:3D:B9:98:A4:82:C0:05:39:E2:DA:B7:DB:C3:6F:97:87:1B"}}]},"verification":{"claimed":false,"claimedAt":null,"proofs":[]},"provenance":{"sources":[{"source":"mcp_registry","key":"net.wattstreet/grid","url":"https://registry.modelcontextprotocol.io/v0/servers/net.wattstreet%2Fgrid","firstSeenAt":"2026-09-07T08:19:43.011Z","fetchedAt":"2026-10-08T18:22:12.997Z","normalizedAt":"2026-10-08T18:22:12.997Z"}]},"firstSeenAt":"2026-09-07T08:19:43.011Z","updatedAt":"2026-10-10T08:34:34.403Z"}