{"$schema":"https://wellknown.network/schemas/agent-record-v1.json","schemaVersion":"1","id":"ag_a4fqkkbruj7g","handle":"scienceshot-data-centre-intelligence","url":"https://wellknown.network/agents/scienceshot-data-centre-intelligence","links":{"self":"https://wellknown.network/agents/scienceshot-data-centre-intelligence/record.json","html":"https://wellknown.network/agents/scienceshot-data-centre-intelligence","markdown":"https://wellknown.network/agents/scienceshot-data-centre-intelligence/record.md","api":"https://wellknown.network/api/v1/agents/scienceshot-data-centre-intelligence","status":"https://wellknown.network/api/v1/agents/scienceshot-data-centre-intelligence/status","claim":"https://wellknown.network/agents/scienceshot-data-centre-intelligence/claim","claimApi":"https://wellknown.network/api/v1/claims","claimDescriptor":"https://wellknown.network/agents/scienceshot-data-centre-intelligence/claim.json","badge":"https://wellknown.network/agents/scienceshot-data-centre-intelligence/badge.svg","openapi":"https://wellknown.network/openapi.json","history":"https://wellknown.network/api/v1/agents/scienceshot-data-centre-intelligence/history","tools":"https://wellknown.network/api/v1/agents/scienceshot-data-centre-intelligence/tools"},"ard":{"identifier":"urn:air:scienceshot.com:server:scienceshot-data-centre-intelligence","type":"application/mcp-server-card+json"},"kind":"mcp_server","declared":{"name":"ScienceShot data-centre intelligence","summary":"Dated counts on European data-centre markets, grid connections, rules and the live grid.","description":"Dated counts on European data-centre markets, grid connections, rules and the live grid.","publisher":{"name":"com.scienceshot","url":null},"homepage":"https://scienceshot.com/ai-connector","repository":null,"version":"1.0.0","license":null,"protocols":["mcp"],"tags":[],"pricing":null,"endpoints":[{"url":"https://scienceshot.com/mcp","type":"mcp_streamable_http","auth":null,"probeable":true}],"skills":null,"tools":null,"extra":{"updatedAt":"2026-10-15T20:41:21.82481Z","publishedAt":"2026-10-15T20:41:21.82481Z","registryName":"com.scienceshot/data-centres"},"attribution":{"kind":"mcp_registry","name":"mcp_registry","summary":"mcp_registry","version":"mcp_registry","description":"mcp_registry","homepageUrl":"mcp_registry","publisherName":"mcp_registry"}},"derived":{"capabilities":[{"slug":"dev.docs-lookup","name":"Documentation Lookup","confidence":0.54,"provenance":"derived"},{"slug":"dev.ci-cd","name":"CI/CD & Deploy","confidence":0.525,"provenance":"derived"},{"slug":"productivity.crm","name":"CRM & Sales","confidence":0.525,"provenance":"derived"}],"categories":["dev","productivity"],"language":"en"},"observed":{"status":"live","statusReason":"Responded 3h ago.","lastOkAt":"2026-10-23T08:30:55.418Z","lastProbedAt":"2026-10-23T08:30:55.418Z","statusComputedAt":"2026-10-23T08:33:18.321Z","reliability30d":{"probes":18,"successRate":1,"p50Ms":242,"basis":"service","measures":{"availability":"availability","latency":"response time","tools":"tool surface observed","summary":"Checks reached the service itself."},"checks":{"total":18,"ok":18,"authBoundaryOk":0,"serviceOk":18,"note":"Counted from the observation rows for the window, checks of the server only (HTTP, A2A card, MCP initialize). ok = authBoundaryOk + serviceOk. `probes` is the sum of daily rollups and includes registry checks, so it can differ from `total`."}},"latestObservations":[{"at":"2026-10-23T08:30:55.418Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":302,"error":null,"detail":{"tools":[{"name":"data_centre_market_overview","description":"Dated overview of a European data-centre market: how many data-centre projects of 1 MW or more our pipeline tracker lists and how many are permitted or being bu"},{"name":"grid_connection_status","description":"Where in Europe new grid connections for data centres are paused, rationed, conditional or congested, by country, with the measure's name, what it applies to an"},{"name":"data_centre_rules","description":"The national and EU rules for building and running a data centre in one European country (energy efficiency reporting, waste heat, permitting, grid), each with "},{"name":"grid_carbon_and_price_now","description":"This hour's grid carbon intensity (gCO2/kWh), renewable share and day-ahead power price for a European market, the cleanest window in the next hours and its ran"},{"name":"search_scienceshot","description":"Search ScienceShot's data-centre trackers, reference pages and articles (data centres, grid, energy, electronics, physics). Returns up to 5 pages with title, da"},{"name":"business_case_figures","description":"The inputs of a colocation data-centre business case for one European market: construction cost per MW, colocation prices per kW-month, electricity price, staff"}],"toolCount":6,"toolsHash":"154409a3f90757e8a3002c0598c29381bba1577d80d9b35ad22f20fffa14c81b","serverName":"scienceshot","capabilities":["tools"],"serverVersion":"1.0.0","protocolVersion":"2025-06-18"}},{"at":"2026-10-23T02:23:06.108Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":222,"error":null,"detail":{"tools":[{"name":"data_centre_market_overview","description":"Dated overview of a European data-centre market: how many data-centre projects of 1 MW or more our pipeline tracker lists and how many are permitted or being bu"},{"name":"grid_connection_status","description":"Where in Europe new grid connections for data centres are paused, rationed, conditional or congested, by country, with the measure's name, what it applies to an"},{"name":"data_centre_rules","description":"The national and EU rules for building and running a data centre in one European country (energy efficiency reporting, waste heat, permitting, grid), each with "},{"name":"grid_carbon_and_price_now","description":"This hour's grid carbon intensity (gCO2/kWh), renewable share and day-ahead power price for a European market, the cleanest window in the next hours and its ran"},{"name":"search_scienceshot","description":"Search ScienceShot's data-centre trackers, reference pages and articles (data centres, grid, energy, electronics, physics). Returns up to 5 pages with title, da"},{"name":"business_case_figures","description":"The inputs of a colocation data-centre business case for one European market: construction cost per MW, colocation prices per kW-month, electricity price, staff"}],"toolCount":6,"toolsHash":"154409a3f90757e8a3002c0598c29381bba1577d80d9b35ad22f20fffa14c81b","serverName":"scienceshot","capabilities":["tools"],"serverVersion":"1.0.0","protocolVersion":"2025-06-18"}},{"at":"2026-10-22T19:32:16.739Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":285,"error":null,"detail":{"tools":[{"name":"data_centre_market_overview","description":"Dated overview of a European data-centre market: how many data-centre projects of 1 MW or more our pipeline tracker lists and how many are permitted or being bu"},{"name":"grid_connection_status","description":"Where in Europe new grid connections for data centres are paused, rationed, conditional or congested, by country, with the measure's name, what it applies to an"},{"name":"data_centre_rules","description":"The national and EU rules for building and running a data centre in one European country (energy efficiency reporting, waste heat, permitting, grid), each with "},{"name":"grid_carbon_and_price_now","description":"This hour's grid carbon intensity (gCO2/kWh), renewable share and day-ahead power price for a European market, the cleanest window in the next hours and its ran"},{"name":"search_scienceshot","description":"Search ScienceShot's data-centre trackers, reference pages and articles (data centres, grid, energy, electronics, physics). Returns up to 5 pages with title, da"},{"name":"business_case_figures","description":"The inputs of a colocation data-centre business case for one European market: construction cost per MW, colocation prices per kW-month, electricity price, staff"}],"toolCount":6,"toolsHash":"154409a3f90757e8a3002c0598c29381bba1577d80d9b35ad22f20fffa14c81b","serverName":"scienceshot","capabilities":["tools"],"serverVersion":"1.0.0","protocolVersion":"2025-06-18"}},{"at":"2026-10-22T13:29:10.350Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":289,"error":null,"detail":{"tools":[{"name":"data_centre_market_overview","description":"Dated overview of a European data-centre market: how many data-centre projects of 1 MW or more our pipeline tracker lists and how many are permitted or being bu"},{"name":"grid_connection_status","description":"Where in Europe new grid connections for data centres are paused, rationed, conditional or congested, by country, with the measure's name, what it applies to an"},{"name":"data_centre_rules","description":"The national and EU rules for building and running a data centre in one European country (energy efficiency reporting, waste heat, permitting, grid), each with "},{"name":"grid_carbon_and_price_now","description":"This hour's grid carbon intensity (gCO2/kWh), renewable share and day-ahead power price for a European market, the cleanest window in the next hours and its ran"},{"name":"search_scienceshot","description":"Search ScienceShot's data-centre trackers, reference pages and articles (data centres, grid, energy, electronics, physics). Returns up to 5 pages with title, da"},{"name":"business_case_figures","description":"The inputs of a colocation data-centre business case for one European market: construction cost per MW, colocation prices per kW-month, electricity price, staff"}],"toolCount":6,"toolsHash":"154409a3f90757e8a3002c0598c29381bba1577d80d9b35ad22f20fffa14c81b","serverName":"scienceshot","capabilities":["tools"],"serverVersion":"1.0.0","protocolVersion":"2025-06-18"}},{"at":"2026-10-22T06:26:48.025Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":244,"error":null,"detail":{"tools":[{"name":"data_centre_market_overview","description":"Dated overview of a European data-centre market: how many data-centre projects of 1 MW or more our pipeline tracker lists and how many are permitted or being bu"},{"name":"grid_connection_status","description":"Where in Europe new grid connections for data centres are paused, rationed, conditional or congested, by country, with the measure's name, what it applies to an"},{"name":"data_centre_rules","description":"The national and EU rules for building and running a data centre in one European country (energy efficiency reporting, waste heat, permitting, grid), each with "},{"name":"grid_carbon_and_price_now","description":"This hour's grid carbon intensity (gCO2/kWh), renewable share and day-ahead power price for a European market, the cleanest window in the next hours and its ran"},{"name":"search_scienceshot","description":"Search ScienceShot's data-centre trackers, reference pages and articles (data centres, grid, energy, electronics, physics). Returns up to 5 pages with title, da"},{"name":"business_case_figures","description":"The inputs of a colocation data-centre business case for one European market: construction cost per MW, colocation prices per kW-month, electricity price, staff"}],"toolCount":6,"toolsHash":"154409a3f90757e8a3002c0598c29381bba1577d80d9b35ad22f20fffa14c81b","serverName":"scienceshot","capabilities":["tools"],"serverVersion":"1.0.0","protocolVersion":"2025-06-18"}},{"at":"2026-10-21T23:28:18.757Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":237,"error":null,"detail":{"tools":[{"name":"data_centre_market_overview","description":"Dated overview of a European data-centre market: how many data-centre projects of 1 MW or more our pipeline tracker lists and how many are permitted or being bu"},{"name":"grid_connection_status","description":"Where in Europe new grid connections for data centres are paused, rationed, conditional or congested, by country, with the measure's name, what it applies to an"},{"name":"data_centre_rules","description":"The national and EU rules for building and running a data centre in one European country (energy efficiency reporting, waste heat, permitting, grid), each with "},{"name":"grid_carbon_and_price_now","description":"This hour's grid carbon intensity (gCO2/kWh), renewable share and day-ahead power price for a European market, the cleanest window in the next hours and its ran"},{"name":"search_scienceshot","description":"Search ScienceShot's data-centre trackers, reference pages and articles (data centres, grid, energy, electronics, physics). Returns up to 5 pages with title, da"},{"name":"business_case_figures","description":"The inputs of a colocation data-centre business case for one European market: construction cost per MW, colocation prices per kW-month, electricity price, staff"}],"toolCount":6,"toolsHash":"154409a3f90757e8a3002c0598c29381bba1577d80d9b35ad22f20fffa14c81b","serverName":"scienceshot","capabilities":["tools"],"serverVersion":"1.0.0","protocolVersion":"2025-06-18"}},{"at":"2026-10-21T16:36:26.941Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":269,"error":null,"detail":{"tools":[{"name":"data_centre_market_overview","description":"Dated overview of a European data-centre market: how many data-centre projects of 1 MW or more our pipeline tracker lists and how many are permitted or being bu"},{"name":"grid_connection_status","description":"Where in Europe new grid connections for data centres are paused, rationed, conditional or congested, by country, with the measure's name, what it applies to an"},{"name":"data_centre_rules","description":"The national and EU rules for building and running a data centre in one European country (energy efficiency reporting, waste heat, permitting, grid), each with "},{"name":"grid_carbon_and_price_now","description":"This hour's grid carbon intensity (gCO2/kWh), renewable share and day-ahead power price for a European market, the cleanest window in the next hours and its ran"},{"name":"search_scienceshot","description":"Search ScienceShot's data-centre trackers, reference pages and articles (data centres, grid, energy, electronics, physics). Returns up to 5 pages with title, da"},{"name":"business_case_figures","description":"The inputs of a colocation data-centre business case for one European market: construction cost per MW, colocation prices per kW-month, electricity price, staff"}],"toolCount":6,"toolsHash":"154409a3f90757e8a3002c0598c29381bba1577d80d9b35ad22f20fffa14c81b","serverName":"scienceshot","capabilities":["tools"],"serverVersion":"1.0.0","protocolVersion":"2025-06-18"}},{"at":"2026-10-21T05:26:19.351Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":225,"error":null,"detail":{"tools":[{"name":"data_centre_market_overview","description":"Dated overview of a European data-centre market: how many data-centre projects of 1 MW or more our pipeline tracker lists and how many are permitted or being bu"},{"name":"grid_connection_status","description":"Where in Europe new grid connections for data centres are paused, rationed, conditional or congested, by country, with the measure's name, what it applies to an"},{"name":"data_centre_rules","description":"The national and EU rules for building and running a data centre in one European country (energy efficiency reporting, waste heat, permitting, grid), each with "},{"name":"grid_carbon_and_price_now","description":"This hour's grid carbon intensity (gCO2/kWh), renewable share and day-ahead power price for a European market, the cleanest window in the next hours and its ran"},{"name":"search_scienceshot","description":"Search ScienceShot's data-centre trackers, reference pages and articles (data centres, grid, energy, electronics, physics). Returns up to 5 pages with title, da"},{"name":"business_case_figures","description":"The inputs of a colocation data-centre business case for one European market: construction cost per MW, colocation prices per kW-month, electricity price, staff"}],"toolCount":6,"toolsHash":"154409a3f90757e8a3002c0598c29381bba1577d80d9b35ad22f20fffa14c81b","serverName":"scienceshot","capabilities":["tools"],"serverVersion":"1.0.0","protocolVersion":"2025-06-18"}},{"at":"2026-10-20T23:27:32.211Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":234,"error":null,"detail":{"tools":[{"name":"data_centre_market_overview","description":"Dated overview of a European data-centre market: how many data-centre projects of 1 MW or more our pipeline tracker lists and how many are permitted or being bu"},{"name":"grid_connection_status","description":"Where in Europe new grid connections for data centres are paused, rationed, conditional or congested, by country, with the measure's name, what it applies to an"},{"name":"data_centre_rules","description":"The national and EU rules for building and running a data centre in one European country (energy efficiency reporting, waste heat, permitting, grid), each with "},{"name":"grid_carbon_and_price_now","description":"This hour's grid carbon intensity (gCO2/kWh), renewable share and day-ahead power price for a European market, the cleanest window in the next hours and its ran"},{"name":"search_scienceshot","description":"Search ScienceShot's data-centre trackers, reference pages and articles (data centres, grid, energy, electronics, physics). Returns up to 5 pages with title, da"},{"name":"business_case_figures","description":"The inputs of a colocation data-centre business case for one European market: construction cost per MW, colocation prices per kW-month, electricity price, staff"}],"toolCount":6,"toolsHash":"154409a3f90757e8a3002c0598c29381bba1577d80d9b35ad22f20fffa14c81b","serverName":"scienceshot","capabilities":["tools"],"serverVersion":"1.0.0","protocolVersion":"2025-06-18"}},{"at":"2026-10-20T17:25:48.876Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":299,"error":null,"detail":{"tools":[{"name":"data_centre_market_overview","description":"Dated overview of a European data-centre market: how many data-centre projects of 1 MW or more our pipeline tracker lists and how many are permitted or being bu"},{"name":"grid_connection_status","description":"Where in Europe new grid connections for data centres are paused, rationed, conditional or congested, by country, with the measure's name, what it applies to an"},{"name":"data_centre_rules","description":"The national and EU rules for building and running a data centre in one European country (energy efficiency reporting, waste heat, permitting, grid), each with "},{"name":"grid_carbon_and_price_now","description":"This hour's grid carbon intensity (gCO2/kWh), renewable share and day-ahead power price for a European market, the cleanest window in the next hours and its ran"},{"name":"search_scienceshot","description":"Search ScienceShot's data-centre trackers, reference pages and articles (data centres, grid, energy, electronics, physics). Returns up to 5 pages with title, da"},{"name":"business_case_figures","description":"The inputs of a colocation data-centre business case for one European market: construction cost per MW, colocation prices per kW-month, electricity price, staff"}],"toolCount":6,"toolsHash":"154409a3f90757e8a3002c0598c29381bba1577d80d9b35ad22f20fffa14c81b","serverName":"scienceshot","capabilities":["tools"],"serverVersion":"1.0.0","protocolVersion":"2025-06-18"}}],"tools":[{"name":"data_centre_market_overview","description":"Dated overview of a European data-centre market: how many data-centre projects of 1 MW or more our pipeline tracker lists and how many are permitted or being bu"},{"name":"grid_connection_status","description":"Where in Europe new grid connections for data centres are paused, rationed, conditional or congested, by country, with the measure's name, what it applies to an"},{"name":"data_centre_rules","description":"The national and EU rules for building and running a data centre in one European country (energy efficiency reporting, waste heat, permitting, grid), each with "},{"name":"grid_carbon_and_price_now","description":"This hour's grid carbon intensity (gCO2/kWh), renewable share and day-ahead power price for a European market, the cleanest window in the next hours and its ran"},{"name":"search_scienceshot","description":"Search ScienceShot's data-centre trackers, reference pages and articles (data centres, grid, energy, electronics, physics). Returns up to 5 pages with title, da"},{"name":"business_case_figures","description":"The inputs of a colocation data-centre business case for one European market: construction cost per MW, colocation prices per kW-month, electricity price, staff"}],"package":null,"toolSurface":{"id":"ts_hckpuezmrk6z","endpointId":"ep_fk4g7r3tugsj","hash":"154409a3f90757e8a3002c0598c29381bba1577d80d9b35ad22f20fffa14c81b","toolCount":6,"serverName":"scienceshot","serverVersion":"1.0.0","protocolVersion":"2025-06-18","firstSeenAt":"2026-10-20T17:25:48.886Z","lastSeenAt":"2026-10-23T08:30:55.423Z","observations":10,"toolNames":["data_centre_market_overview","grid_connection_status","data_centre_rules","grid_carbon_and_price_now","search_scienceshot","business_case_figures"],"distinctSurfaces":4},"endpointFacts":[{"id":"ep_fk4g7r3tugsj","url":"https://scienceshot.com/mcp","type":"mcp_streamable_http","factsCheckedAt":"2026-10-23T02:23:06.121Z","auth":{"observedAt":"2026-10-23T02:23:06.533Z","authRequired":false,"scheme":null,"resourceMetadata":null,"authorizationServer":null,"conformance":{"dpop":false,"rfc8414":false,"rfc9728":false,"pkceS256":false,"clientIdMetadataDocument":false,"dynamicClientRegistration":false}},"tls":{"observedAt":"2026-10-23T02:23:06.545Z","protocol":"TLSv1.3","chainValid":true,"chainError":null,"hostMatches":true,"subject":"scienceshot.com","issuer":{"commonName":"YE1","organization":"Let's Encrypt"},"validFrom":"2026-10-18T17:51:08.000Z","validTo":"2027-01-16T17:51:07.000Z","daysToExpiry":85,"sanCount":2,"fingerprint256":"A2:9F:37:78:C8:B7:D1:01:C3:56:AC:1B:E0:53:CC:C6:E0:58:2B:2F:1A:4F:A8:A4:DB:D0:CA:B3:FF:DA:0D:45"}}]},"verification":{"claimed":false,"claimedAt":null,"proofs":[]},"provenance":{"sources":[{"source":"mcp_registry","key":"com.scienceshot/data-centres","url":"https://registry.modelcontextprotocol.io/v0/servers/com.scienceshot%2Fdata-centres","firstSeenAt":"2026-10-18T11:22:04.425Z","fetchedAt":"2026-10-22T01:23:01.568Z","normalizedAt":"2026-10-22T01:23:01.568Z"}]},"firstSeenAt":"2026-10-18T11:22:04.425Z","updatedAt":"2026-10-23T08:35:30.416Z"}