{"$schema":"https://wellknown.network/schemas/agent-record-v1.json","schemaVersion":"1","id":"ag_7zqsv8a9d5fe","handle":"openfab","url":"https://wellknown.network/agents/openfab","links":{"self":"https://wellknown.network/agents/openfab/record.json","html":"https://wellknown.network/agents/openfab","markdown":"https://wellknown.network/agents/openfab/record.md","api":"https://wellknown.network/api/v1/agents/openfab","status":"https://wellknown.network/api/v1/agents/openfab/status","claim":"https://wellknown.network/agents/openfab/claim","claimApi":"https://wellknown.network/api/v1/claims","claimDescriptor":"https://wellknown.network/agents/openfab/claim.json","badge":"https://wellknown.network/agents/openfab/badge.svg","openapi":"https://wellknown.network/openapi.json","history":"https://wellknown.network/api/v1/agents/openfab/history","tools":"https://wellknown.network/api/v1/agents/openfab/tools"},"ard":{"identifier":"urn:air:openfab-22100483453.us-central1.run.app:server:openfab","type":"application/mcp-server-card+json"},"kind":"mcp_server","declared":{"name":"OpenFab","summary":"Instant parametric cost estimates for custom manufacturing: CNC, molding, sheet metal, 3DP, PCB.","description":"Instant parametric cost estimates for custom manufacturing: CNC, molding, sheet metal, 3DP, PCB.","publisher":{"name":"yyphilo","url":null},"homepage":null,"repository":"https://github.com/yyphilo/openfab","version":"0.2.0","license":null,"protocols":["mcp"],"tags":[],"pricing":null,"endpoints":[{"url":"https://openfab-22100483453.us-central1.run.app/mcp","type":"mcp_streamable_http","auth":null,"probeable":true}],"skills":null,"tools":null,"extra":{"updatedAt":"2026-08-14T04:46:39.848231Z","publishedAt":"2026-08-14T04:46:39.848231Z","registryName":"io.github.yyphilo/openfab"},"attribution":{"kind":"mcp_registry","name":"mcp_registry","repoUrl":"mcp_registry","summary":"mcp_registry","version":"mcp_registry","description":"mcp_registry","publisherName":"mcp_registry"}},"derived":{"capabilities":[{"slug":"commerce.pricing","name":"Pricing & Quotes","confidence":1,"provenance":"derived"}],"categories":["commerce"],"language":"en"},"observed":{"status":"live","statusReason":"Responded 41m ago.","lastOkAt":"2026-10-10T01:24:21.474Z","lastProbedAt":"2026-10-10T01:24:21.474Z","statusComputedAt":"2026-10-10T01:26:01.288Z","reliability30d":{"probes":109,"successRate":1,"p50Ms":314,"basis":"service","measures":{"availability":"availability","latency":"response time","tools":"tool surface observed","summary":"Checks reached the service itself."},"checks":{"total":109,"ok":109,"authBoundaryOk":0,"serviceOk":109,"note":"Counted from the observation rows for the window, checks of the server only (HTTP, A2A card, MCP initialize). ok = authBoundaryOk + serviceOk. `probes` is the sum of daily rollups and includes registry checks, so it can differ from `total`."}},"latestObservations":[{"at":"2026-10-10T01:24:21.474Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":282,"error":null,"detail":{"tools":[{"name":"discover_capabilities","description":"List supported manufacturing processes, materials, and the fields an estimate accepts."},{"name":"request_quote","description":"Get an instant cost estimate for a custom manufactured part. Returns unit price, total, lead time, and assumptions. Indicative and non-binding."},{"name":"refine_quote","description":"Refine a previous estimate (change quantity, material, tolerance, finish) by passing its quote_token."},{"name":"get_lead_time","description":"Estimated production lead time in days, by process and quantity."},{"name":"dfm_feedback","description":"Rule-based design-for-manufacturability feedback for a part specification."},{"name":"estimate_bom","description":"Estimate costs for a multi-part bill of materials in one call.\n\n    Each part: {process, quantity, material?, bounding_box_mm?, tolerance_mm?,\n    finish?}. Ret"},{"name":"compare_processes","description":"Compare cost and lead time for one part across manufacturing processes.\n\n    Provide 2-8 process names and a quantity; returns per-process estimates\n    sorted "}],"toolCount":7,"toolsHash":"e2771304eefd4ab17ffc5e4052bac419833c491e0dbe50f308db7684802554d9","serverName":"OpenFab","capabilities":["experimental","prompts","resources","tools"],"serverVersion":"1.29.0","protocolVersion":"2025-06-18"}},{"at":"2026-10-09T18:24:50.721Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":273,"error":null,"detail":{"tools":[{"name":"discover_capabilities","description":"List supported manufacturing processes, materials, and the fields an estimate accepts."},{"name":"request_quote","description":"Get an instant cost estimate for a custom manufactured part. Returns unit price, total, lead time, and assumptions. Indicative and non-binding."},{"name":"refine_quote","description":"Refine a previous estimate (change quantity, material, tolerance, finish) by passing its quote_token."},{"name":"get_lead_time","description":"Estimated production lead time in days, by process and quantity."},{"name":"dfm_feedback","description":"Rule-based design-for-manufacturability feedback for a part specification."},{"name":"estimate_bom","description":"Estimate costs for a multi-part bill of materials in one call.\n\n    Each part: {process, quantity, material?, bounding_box_mm?, tolerance_mm?,\n    finish?}. Ret"},{"name":"compare_processes","description":"Compare cost and lead time for one part across manufacturing processes.\n\n    Provide 2-8 process names and a quantity; returns per-process estimates\n    sorted "}],"toolCount":7,"toolsHash":"e2771304eefd4ab17ffc5e4052bac419833c491e0dbe50f308db7684802554d9","serverName":"OpenFab","capabilities":["experimental","prompts","resources","tools"],"serverVersion":"1.29.0","protocolVersion":"2025-06-18"}},{"at":"2026-10-09T11:26:57.285Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":357,"error":null,"detail":{"tools":[{"name":"discover_capabilities","description":"List supported manufacturing processes, materials, and the fields an estimate accepts."},{"name":"request_quote","description":"Get an instant cost estimate for a custom manufactured part. Returns unit price, total, lead time, and assumptions. Indicative and non-binding."},{"name":"refine_quote","description":"Refine a previous estimate (change quantity, material, tolerance, finish) by passing its quote_token."},{"name":"get_lead_time","description":"Estimated production lead time in days, by process and quantity."},{"name":"dfm_feedback","description":"Rule-based design-for-manufacturability feedback for a part specification."},{"name":"estimate_bom","description":"Estimate costs for a multi-part bill of materials in one call.\n\n    Each part: {process, quantity, material?, bounding_box_mm?, tolerance_mm?,\n    finish?}. Ret"},{"name":"compare_processes","description":"Compare cost and lead time for one part across manufacturing processes.\n\n    Provide 2-8 process names and a quantity; returns per-process estimates\n    sorted "}],"toolCount":7,"toolsHash":"e2771304eefd4ab17ffc5e4052bac419833c491e0dbe50f308db7684802554d9","serverName":"OpenFab","capabilities":["experimental","prompts","resources","tools"],"serverVersion":"1.29.0","protocolVersion":"2025-06-18"}},{"at":"2026-10-09T05:26:06.942Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":287,"error":null,"detail":{"tools":[{"name":"discover_capabilities","description":"List supported manufacturing processes, materials, and the fields an estimate accepts."},{"name":"request_quote","description":"Get an instant cost estimate for a custom manufactured part. Returns unit price, total, lead time, and assumptions. Indicative and non-binding."},{"name":"refine_quote","description":"Refine a previous estimate (change quantity, material, tolerance, finish) by passing its quote_token."},{"name":"get_lead_time","description":"Estimated production lead time in days, by process and quantity."},{"name":"dfm_feedback","description":"Rule-based design-for-manufacturability feedback for a part specification."},{"name":"estimate_bom","description":"Estimate costs for a multi-part bill of materials in one call.\n\n    Each part: {process, quantity, material?, bounding_box_mm?, tolerance_mm?,\n    finish?}. Ret"},{"name":"compare_processes","description":"Compare cost and lead time for one part across manufacturing processes.\n\n    Provide 2-8 process names and a quantity; returns per-process estimates\n    sorted "}],"toolCount":7,"toolsHash":"e2771304eefd4ab17ffc5e4052bac419833c491e0dbe50f308db7684802554d9","serverName":"OpenFab","capabilities":["experimental","prompts","resources","tools"],"serverVersion":"1.29.0","protocolVersion":"2025-06-18"}},{"at":"2026-10-08T22:23:25.490Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":306,"error":null,"detail":{"tools":[{"name":"discover_capabilities","description":"List supported manufacturing processes, materials, and the fields an estimate accepts."},{"name":"request_quote","description":"Get an instant cost estimate for a custom manufactured part. Returns unit price, total, lead time, and assumptions. Indicative and non-binding."},{"name":"refine_quote","description":"Refine a previous estimate (change quantity, material, tolerance, finish) by passing its quote_token."},{"name":"get_lead_time","description":"Estimated production lead time in days, by process and quantity."},{"name":"dfm_feedback","description":"Rule-based design-for-manufacturability feedback for a part specification."},{"name":"estimate_bom","description":"Estimate costs for a multi-part bill of materials in one call.\n\n    Each part: {process, quantity, material?, bounding_box_mm?, tolerance_mm?,\n    finish?}. Ret"},{"name":"compare_processes","description":"Compare cost and lead time for one part across manufacturing processes.\n\n    Provide 2-8 process names and a quantity; returns per-process estimates\n    sorted "}],"toolCount":7,"toolsHash":"e2771304eefd4ab17ffc5e4052bac419833c491e0dbe50f308db7684802554d9","serverName":"OpenFab","capabilities":["experimental","prompts","resources","tools"],"serverVersion":"1.29.0","protocolVersion":"2025-06-18"}},{"at":"2026-10-08T15:23:19.211Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":292,"error":null,"detail":{"tools":[{"name":"discover_capabilities","description":"List supported manufacturing processes, materials, and the fields an estimate accepts."},{"name":"request_quote","description":"Get an instant cost estimate for a custom manufactured part. Returns unit price, total, lead time, and assumptions. Indicative and non-binding."},{"name":"refine_quote","description":"Refine a previous estimate (change quantity, material, tolerance, finish) by passing its quote_token."},{"name":"get_lead_time","description":"Estimated production lead time in days, by process and quantity."},{"name":"dfm_feedback","description":"Rule-based design-for-manufacturability feedback for a part specification."},{"name":"estimate_bom","description":"Estimate costs for a multi-part bill of materials in one call.\n\n    Each part: {process, quantity, material?, bounding_box_mm?, tolerance_mm?,\n    finish?}. Ret"},{"name":"compare_processes","description":"Compare cost and lead time for one part across manufacturing processes.\n\n    Provide 2-8 process names and a quantity; returns per-process estimates\n    sorted "}],"toolCount":7,"toolsHash":"e2771304eefd4ab17ffc5e4052bac419833c491e0dbe50f308db7684802554d9","serverName":"OpenFab","capabilities":["experimental","prompts","resources","tools"],"serverVersion":"1.29.0","protocolVersion":"2025-06-18"}},{"at":"2026-10-08T08:30:09.306Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":286,"error":null,"detail":{"tools":[{"name":"discover_capabilities","description":"List supported manufacturing processes, materials, and the fields an estimate accepts."},{"name":"request_quote","description":"Get an instant cost estimate for a custom manufactured part. Returns unit price, total, lead time, and assumptions. Indicative and non-binding."},{"name":"refine_quote","description":"Refine a previous estimate (change quantity, material, tolerance, finish) by passing its quote_token."},{"name":"get_lead_time","description":"Estimated production lead time in days, by process and quantity."},{"name":"dfm_feedback","description":"Rule-based design-for-manufacturability feedback for a part specification."},{"name":"estimate_bom","description":"Estimate costs for a multi-part bill of materials in one call.\n\n    Each part: {process, quantity, material?, bounding_box_mm?, tolerance_mm?,\n    finish?}. Ret"},{"name":"compare_processes","description":"Compare cost and lead time for one part across manufacturing processes.\n\n    Provide 2-8 process names and a quantity; returns per-process estimates\n    sorted "}],"toolCount":7,"toolsHash":"e2771304eefd4ab17ffc5e4052bac419833c491e0dbe50f308db7684802554d9","serverName":"OpenFab","capabilities":["experimental","prompts","resources","tools"],"serverVersion":"1.29.0","protocolVersion":"2025-06-18"}},{"at":"2026-10-08T02:21:49.167Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":298,"error":null,"detail":{"tools":[{"name":"discover_capabilities","description":"List supported manufacturing processes, materials, and the fields an estimate accepts."},{"name":"request_quote","description":"Get an instant cost estimate for a custom manufactured part. Returns unit price, total, lead time, and assumptions. Indicative and non-binding."},{"name":"refine_quote","description":"Refine a previous estimate (change quantity, material, tolerance, finish) by passing its quote_token."},{"name":"get_lead_time","description":"Estimated production lead time in days, by process and quantity."},{"name":"dfm_feedback","description":"Rule-based design-for-manufacturability feedback for a part specification."},{"name":"estimate_bom","description":"Estimate costs for a multi-part bill of materials in one call.\n\n    Each part: {process, quantity, material?, bounding_box_mm?, tolerance_mm?,\n    finish?}. Ret"},{"name":"compare_processes","description":"Compare cost and lead time for one part across manufacturing processes.\n\n    Provide 2-8 process names and a quantity; returns per-process estimates\n    sorted "}],"toolCount":7,"toolsHash":"e2771304eefd4ab17ffc5e4052bac419833c491e0dbe50f308db7684802554d9","serverName":"OpenFab","capabilities":["experimental","prompts","resources","tools"],"serverVersion":"1.29.0","protocolVersion":"2025-06-18"}},{"at":"2026-10-07T19:24:45.270Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":294,"error":null,"detail":{"tools":[{"name":"discover_capabilities","description":"List supported manufacturing processes, materials, and the fields an estimate accepts."},{"name":"request_quote","description":"Get an instant cost estimate for a custom manufactured part. Returns unit price, total, lead time, and assumptions. Indicative and non-binding."},{"name":"refine_quote","description":"Refine a previous estimate (change quantity, material, tolerance, finish) by passing its quote_token."},{"name":"get_lead_time","description":"Estimated production lead time in days, by process and quantity."},{"name":"dfm_feedback","description":"Rule-based design-for-manufacturability feedback for a part specification."},{"name":"estimate_bom","description":"Estimate costs for a multi-part bill of materials in one call.\n\n    Each part: {process, quantity, material?, bounding_box_mm?, tolerance_mm?,\n    finish?}. Ret"},{"name":"compare_processes","description":"Compare cost and lead time for one part across manufacturing processes.\n\n    Provide 2-8 process names and a quantity; returns per-process estimates\n    sorted "}],"toolCount":7,"toolsHash":"e2771304eefd4ab17ffc5e4052bac419833c491e0dbe50f308db7684802554d9","serverName":"OpenFab","capabilities":["experimental","prompts","resources","tools"],"serverVersion":"1.29.0","protocolVersion":"2025-06-18"}},{"at":"2026-10-07T13:27:59.601Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":336,"error":null,"detail":{"tools":[{"name":"discover_capabilities","description":"List supported manufacturing processes, materials, and the fields an estimate accepts."},{"name":"request_quote","description":"Get an instant cost estimate for a custom manufactured part. Returns unit price, total, lead time, and assumptions. Indicative and non-binding."},{"name":"refine_quote","description":"Refine a previous estimate (change quantity, material, tolerance, finish) by passing its quote_token."},{"name":"get_lead_time","description":"Estimated production lead time in days, by process and quantity."},{"name":"dfm_feedback","description":"Rule-based design-for-manufacturability feedback for a part specification."},{"name":"estimate_bom","description":"Estimate costs for a multi-part bill of materials in one call.\n\n    Each part: {process, quantity, material?, bounding_box_mm?, tolerance_mm?,\n    finish?}. Ret"},{"name":"compare_processes","description":"Compare cost and lead time for one part across manufacturing processes.\n\n    Provide 2-8 process names and a quantity; returns per-process estimates\n    sorted "}],"toolCount":7,"toolsHash":"e2771304eefd4ab17ffc5e4052bac419833c491e0dbe50f308db7684802554d9","serverName":"OpenFab","capabilities":["experimental","prompts","resources","tools"],"serverVersion":"1.29.0","protocolVersion":"2025-06-18"}}],"tools":[{"name":"discover_capabilities","description":"List supported manufacturing processes, materials, and the fields an estimate accepts."},{"name":"request_quote","description":"Get an instant cost estimate for a custom manufactured part. Returns unit price, total, lead time, and assumptions. Indicative and non-binding."},{"name":"refine_quote","description":"Refine a previous estimate (change quantity, material, tolerance, finish) by passing its quote_token."},{"name":"get_lead_time","description":"Estimated production lead time in days, by process and quantity."},{"name":"dfm_feedback","description":"Rule-based design-for-manufacturability feedback for a part specification."},{"name":"estimate_bom","description":"Estimate costs for a multi-part bill of materials in one call.\n\n    Each part: {process, quantity, material?, bounding_box_mm?, tolerance_mm?,\n    finish?}. Ret"},{"name":"compare_processes","description":"Compare cost and lead time for one part across manufacturing processes.\n\n    Provide 2-8 process names and a quantity; returns per-process estimates\n    sorted "}],"package":null,"toolSurface":{"id":"ts_8sruhwuwg38e","endpointId":"ep_2y6tjtgk222h","hash":"e2771304eefd4ab17ffc5e4052bac419833c491e0dbe50f308db7684802554d9","toolCount":7,"serverName":"OpenFab","serverVersion":"1.29.0","protocolVersion":"2025-06-18","firstSeenAt":"2026-09-12T15:25:28.572Z","lastSeenAt":"2026-10-10T01:24:21.496Z","observations":101,"toolNames":["discover_capabilities","request_quote","refine_quote","get_lead_time","dfm_feedback","estimate_bom","compare_processes"],"distinctSurfaces":1},"endpointFacts":[{"id":"ep_2y6tjtgk222h","url":"https://openfab-22100483453.us-central1.run.app/mcp","type":"mcp_streamable_http","factsCheckedAt":"2026-10-08T22:23:25.482Z","auth":{"observedAt":"2026-10-08T22:23:25.661Z","authRequired":false,"scheme":null,"resourceMetadata":null,"authorizationServer":null,"conformance":{"dpop":false,"rfc8414":false,"rfc9728":false,"pkceS256":false,"clientIdMetadataDocument":false,"dynamicClientRegistration":false}},"tls":{"observedAt":"2026-10-08T22:23:25.669Z","protocol":"TLSv1.3","chainValid":true,"chainError":null,"hostMatches":true,"subject":"*.a.run.app","issuer":{"commonName":"WR2","organization":"Google Trust Services"},"validFrom":"2026-09-18T19:59:58.000Z","validTo":"2026-12-11T19:59:57.000Z","daysToExpiry":62,"sanCount":105,"fingerprint256":"76:79:1D:B2:EA:3D:5A:C7:29:84:4B:4C:02:6C:6D:45:22:2C:9D:8A:95:EA:63:96:4F:C5:4C:E0:68:16:08:D5"}}]},"verification":{"claimed":false,"claimedAt":null,"proofs":[]},"provenance":{"sources":[{"source":"mcp_registry","key":"io.github.yyphilo/openfab","url":"https://registry.modelcontextprotocol.io/v0/servers/io.github.yyphilo%2Fopenfab","firstSeenAt":"2026-09-07T06:18:16.784Z","fetchedAt":"2026-10-08T16:21:10.022Z","normalizedAt":"2026-10-08T16:21:10.022Z"}]},"firstSeenAt":"2026-09-07T06:18:16.784Z","updatedAt":"2026-10-10T01:26:47.472Z"}