{"$schema":"https://wellknown.network/schemas/agent-record-v1.json","schemaVersion":"1","id":"ag_9zxbfabby9jr","handle":"open-factory","url":"https://wellknown.network/agents/open-factory","links":{"self":"https://wellknown.network/agents/open-factory/record.json","html":"https://wellknown.network/agents/open-factory","markdown":"https://wellknown.network/agents/open-factory/record.md","api":"https://wellknown.network/api/v1/agents/open-factory","status":"https://wellknown.network/api/v1/agents/open-factory/status","claim":"https://wellknown.network/agents/open-factory/claim","claimApi":"https://wellknown.network/api/v1/claims","claimDescriptor":"https://wellknown.network/agents/open-factory/claim.json","badge":"https://wellknown.network/agents/open-factory/badge.svg","openapi":"https://wellknown.network/openapi.json","history":"https://wellknown.network/api/v1/agents/open-factory/history","tools":"https://wellknown.network/api/v1/agents/open-factory/tools"},"ard":{"identifier":"urn:air:open-factory.com:server:open-factory","type":"application/mcp-server-card+json"},"kind":"mcp_server","declared":{"name":"Open Factory","summary":"Lead times, prices, tariffs and grid interconnection terms for factory and datacenter equipment.","description":"Lead times, prices, tariffs and grid interconnection terms for factory and datacenter equipment.","publisher":{"name":"com.open-factory","url":null},"homepage":"https://open-factory.com/developers/","repository":null,"version":"1.0.0","license":null,"protocols":["mcp"],"tags":[],"pricing":null,"endpoints":[{"url":"https://open-factory.com/mcp","type":"mcp_streamable_http","auth":null,"probeable":true}],"skills":null,"tools":null,"extra":{"updatedAt":"2026-10-16T19:04:15.575353Z","publishedAt":"2026-10-16T19:04:15.575353Z","registryName":"com.open-factory/open-factory"},"attribution":{"kind":"mcp_registry","name":"mcp_registry","summary":"mcp_registry","version":"mcp_registry","description":"mcp_registry","homepageUrl":"mcp_registry","publisherName":"mcp_registry"}},"derived":{"capabilities":[{"slug":"documents.contracts","name":"Contracts & Legal","confidence":0.525,"provenance":"derived"},{"slug":"data.weather","name":"Weather","confidence":0.525,"provenance":"derived"},{"slug":"content.writing","name":"Writing & Editing","confidence":0.51,"provenance":"derived"}],"categories":["content","data","documents"],"language":"en"},"observed":{"status":"live","statusReason":"Responded 4h ago.","lastOkAt":"2026-10-25T07:25:42.659Z","lastProbedAt":"2026-10-25T07:25:42.659Z","statusComputedAt":"2026-10-25T07:26:59.841Z","reliability30d":{"probes":25,"successRate":1,"p50Ms":106,"basis":"service","measures":{"availability":"availability","latency":"response time","tools":"tool surface observed","summary":"Checks reached the service itself."},"checks":{"total":25,"ok":25,"authBoundaryOk":0,"serviceOk":25,"note":"Counted from the observation rows for the window, checks of the server only (HTTP, A2A card, MCP initialize). ok = authBoundaryOk + serviceOk. `probes` is the sum of daily rollups and includes registry checks, so it can differ from `total`."}},"latestObservations":[{"at":"2026-10-25T07:25:42.659Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":78,"error":null,"detail":{"tools":[{"name":"search_articles","description":"Search Open Factory articles by topic, equipment class, company, tag or series ID. Returns the best matches with slug, URL, date, pillar, summary and the CSV fi"},{"name":"get_article","description":"Full metadata and the free text (markdown) of one Open Factory article by slug, with its cited sources and CSV files. Articles with a paywall return the text up"},{"name":"get_index_readings","description":"The current public headline number of every Open Factory model (lead time, build cost per MW, book-to-bill, OEM disclosure, energization year), each with its so"},{"name":"get_lead_times","description":"Current published lead time, in weeks, for factory and datacenter electrical equipment classes (transformers, switchgear, switchboards, MCC, busway, gensets, AT"},{"name":"get_price_bands","description":"Transaction price bands from public procurement awards: pad-mount and power transformers ($/kVA), MV switchgear, gensets ($/kW) and chillers ($/ton), with p25, "},{"name":"get_tariff_rates","description":"US import tariff for factory and datacenter equipment: 22 HTS lines (transformers, switchgear, gensets, chillers, machine tools, robots and parts) by origin cou"},{"name":"get_large_load_terms","description":"What a 50 MW or larger load pays to connect in fifteen US utilities and markets: study fee, security or collateral per MW, minimum bill, contract term, ramp, ex"},{"name":"get_book_to_bill","description":"Latest quarter orders, revenue, backlog, book-to-bill and backlog growth for the electrical, power and cooling OEMs (Eaton, GE Vernova, Siemens Energy, ABB, Sch"},{"name":"get_disclosure_scorecard","description":"Whether each equipment OEM publishes a dated lead-time schedule, list prices, backlog in dollars, capacity in units and delivery performance, scored yes, partia"},{"name":"get_record","description":"Every dated, checkable forecast Open Factory has made (lead times, prices, tariffs, power), the public series it is scored against, the date it resolves, and th"},{"name":"list_datasets","description":"The CSV files behind every chart Open Factory publishes, grouped by article, with direct download URLs. Each file keeps a source column naming the filing, tarif"},{"name":"get_tool_data","description":"The source table one Open Factory calculator runs on, with every input's provenance: copper-wire-price-sheet, genset-tco, interconnection-cost, lead-time-schedu"}],"toolCount":12,"toolsHash":"6f016a12c9b713c26f6b6a825fe7bf5e85d0dce39de496ac588992c8fd37cfb0","serverName":"open-factory","capabilities":["tools"],"serverVersion":"1.0.0","protocolVersion":"2025-06-18"}},{"at":"2026-10-25T00:30:52.718Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":65,"error":null,"detail":{"tools":[{"name":"search_articles","description":"Search Open Factory articles by topic, equipment class, company, tag or series ID. Returns the best matches with slug, URL, date, pillar, summary and the CSV fi"},{"name":"get_article","description":"Full metadata and the free text (markdown) of one Open Factory article by slug, with its cited sources and CSV files. Articles with a paywall return the text up"},{"name":"get_index_readings","description":"The current public headline number of every Open Factory model (lead time, build cost per MW, book-to-bill, OEM disclosure, energization year), each with its so"},{"name":"get_lead_times","description":"Current published lead time, in weeks, for factory and datacenter electrical equipment classes (transformers, switchgear, switchboards, MCC, busway, gensets, AT"},{"name":"get_price_bands","description":"Transaction price bands from public procurement awards: pad-mount and power transformers ($/kVA), MV switchgear, gensets ($/kW) and chillers ($/ton), with p25, "},{"name":"get_tariff_rates","description":"US import tariff for factory and datacenter equipment: 22 HTS lines (transformers, switchgear, gensets, chillers, machine tools, robots and parts) by origin cou"},{"name":"get_large_load_terms","description":"What a 50 MW or larger load pays to connect in fifteen US utilities and markets: study fee, security or collateral per MW, minimum bill, contract term, ramp, ex"},{"name":"get_book_to_bill","description":"Latest quarter orders, revenue, backlog, book-to-bill and backlog growth for the electrical, power and cooling OEMs (Eaton, GE Vernova, Siemens Energy, ABB, Sch"},{"name":"get_disclosure_scorecard","description":"Whether each equipment OEM publishes a dated lead-time schedule, list prices, backlog in dollars, capacity in units and delivery performance, scored yes, partia"},{"name":"get_record","description":"Every dated, checkable forecast Open Factory has made (lead times, prices, tariffs, power), the public series it is scored against, the date it resolves, and th"},{"name":"list_datasets","description":"The CSV files behind every chart Open Factory publishes, grouped by article, with direct download URLs. Each file keeps a source column naming the filing, tarif"},{"name":"get_tool_data","description":"The source table one Open Factory calculator runs on, with every input's provenance: copper-wire-price-sheet, genset-tco, interconnection-cost, lead-time-schedu"}],"toolCount":12,"toolsHash":"6f016a12c9b713c26f6b6a825fe7bf5e85d0dce39de496ac588992c8fd37cfb0","serverName":"open-factory","capabilities":["tools"],"serverVersion":"1.0.0","protocolVersion":"2025-06-18"}},{"at":"2026-10-24T17:33:44.604Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":159,"error":null,"detail":{"tools":[{"name":"search_articles","description":"Search Open Factory articles by topic, equipment class, company, tag or series ID. Returns the best matches with slug, URL, date, pillar, summary and the CSV fi"},{"name":"get_article","description":"Full metadata and the free text (markdown) of one Open Factory article by slug, with its cited sources and CSV files. Articles with a paywall return the text up"},{"name":"get_index_readings","description":"The current public headline number of every Open Factory model (lead time, build cost per MW, book-to-bill, OEM disclosure, energization year), each with its so"},{"name":"get_lead_times","description":"Current published lead time, in weeks, for factory and datacenter electrical equipment classes (transformers, switchgear, switchboards, MCC, busway, gensets, AT"},{"name":"get_price_bands","description":"Transaction price bands from public procurement awards: pad-mount and power transformers ($/kVA), MV switchgear, gensets ($/kW) and chillers ($/ton), with p25, "},{"name":"get_tariff_rates","description":"US import tariff for factory and datacenter equipment: 22 HTS lines (transformers, switchgear, gensets, chillers, machine tools, robots and parts) by origin cou"},{"name":"get_large_load_terms","description":"What a 50 MW or larger load pays to connect in fifteen US utilities and markets: study fee, security or collateral per MW, minimum bill, contract term, ramp, ex"},{"name":"get_book_to_bill","description":"Latest quarter orders, revenue, backlog, book-to-bill and backlog growth for the electrical, power and cooling OEMs (Eaton, GE Vernova, Siemens Energy, ABB, Sch"},{"name":"get_disclosure_scorecard","description":"Whether each equipment OEM publishes a dated lead-time schedule, list prices, backlog in dollars, capacity in units and delivery performance, scored yes, partia"},{"name":"get_record","description":"Every dated, checkable forecast Open Factory has made (lead times, prices, tariffs, power), the public series it is scored against, the date it resolves, and th"},{"name":"list_datasets","description":"The CSV files behind every chart Open Factory publishes, grouped by article, with direct download URLs. Each file keeps a source column naming the filing, tarif"},{"name":"get_tool_data","description":"The source table one Open Factory calculator runs on, with every input's provenance: copper-wire-price-sheet, genset-tco, interconnection-cost, lead-time-schedu"}],"toolCount":12,"toolsHash":"6f016a12c9b713c26f6b6a825fe7bf5e85d0dce39de496ac588992c8fd37cfb0","serverName":"open-factory","capabilities":["tools"],"serverVersion":"1.0.0","protocolVersion":"2025-06-18"}},{"at":"2026-10-24T10:24:43.638Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":86,"error":null,"detail":{"tools":[{"name":"search_articles","description":"Search Open Factory articles by topic, equipment class, company, tag or series ID. Returns the best matches with slug, URL, date, pillar, summary and the CSV fi"},{"name":"get_article","description":"Full metadata and the free text (markdown) of one Open Factory article by slug, with its cited sources and CSV files. Articles with a paywall return the text up"},{"name":"get_index_readings","description":"The current public headline number of every Open Factory model (lead time, build cost per MW, book-to-bill, OEM disclosure, energization year), each with its so"},{"name":"get_lead_times","description":"Current published lead time, in weeks, for factory and datacenter electrical equipment classes (transformers, switchgear, switchboards, MCC, busway, gensets, AT"},{"name":"get_price_bands","description":"Transaction price bands from public procurement awards: pad-mount and power transformers ($/kVA), MV switchgear, gensets ($/kW) and chillers ($/ton), with p25, "},{"name":"get_tariff_rates","description":"US import tariff for factory and datacenter equipment: 22 HTS lines (transformers, switchgear, gensets, chillers, machine tools, robots and parts) by origin cou"},{"name":"get_large_load_terms","description":"What a 50 MW or larger load pays to connect in fifteen US utilities and markets: study fee, security or collateral per MW, minimum bill, contract term, ramp, ex"},{"name":"get_book_to_bill","description":"Latest quarter orders, revenue, backlog, book-to-bill and backlog growth for the electrical, power and cooling OEMs (Eaton, GE Vernova, Siemens Energy, ABB, Sch"},{"name":"get_disclosure_scorecard","description":"Whether each equipment OEM publishes a dated lead-time schedule, list prices, backlog in dollars, capacity in units and delivery performance, scored yes, partia"},{"name":"get_record","description":"Every dated, checkable forecast Open Factory has made (lead times, prices, tariffs, power), the public series it is scored against, the date it resolves, and th"},{"name":"list_datasets","description":"The CSV files behind every chart Open Factory publishes, grouped by article, with direct download URLs. Each file keeps a source column naming the filing, tarif"},{"name":"get_tool_data","description":"The source table one Open Factory calculator runs on, with every input's provenance: copper-wire-price-sheet, genset-tco, interconnection-cost, lead-time-schedu"}],"toolCount":12,"toolsHash":"6f016a12c9b713c26f6b6a825fe7bf5e85d0dce39de496ac588992c8fd37cfb0","serverName":"open-factory","capabilities":["tools"],"serverVersion":"1.0.0","protocolVersion":"2025-06-18"}},{"at":"2026-10-24T03:21:51.326Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":66,"error":null,"detail":{"tools":[{"name":"search_articles","description":"Search Open Factory articles by topic, equipment class, company, tag or series ID. Returns the best matches with slug, URL, date, pillar, summary and the CSV fi"},{"name":"get_article","description":"Full metadata and the free text (markdown) of one Open Factory article by slug, with its cited sources and CSV files. Articles with a paywall return the text up"},{"name":"get_index_readings","description":"The current public headline number of every Open Factory model (lead time, build cost per MW, book-to-bill, OEM disclosure, energization year), each with its so"},{"name":"get_lead_times","description":"Current published lead time, in weeks, for factory and datacenter electrical equipment classes (transformers, switchgear, switchboards, MCC, busway, gensets, AT"},{"name":"get_price_bands","description":"Transaction price bands from public procurement awards: pad-mount and power transformers ($/kVA), MV switchgear, gensets ($/kW) and chillers ($/ton), with p25, "},{"name":"get_tariff_rates","description":"US import tariff for factory and datacenter equipment: 22 HTS lines (transformers, switchgear, gensets, chillers, machine tools, robots and parts) by origin cou"},{"name":"get_large_load_terms","description":"What a 50 MW or larger load pays to connect in fifteen US utilities and markets: study fee, security or collateral per MW, minimum bill, contract term, ramp, ex"},{"name":"get_book_to_bill","description":"Latest quarter orders, revenue, backlog, book-to-bill and backlog growth for the electrical, power and cooling OEMs (Eaton, GE Vernova, Siemens Energy, ABB, Sch"},{"name":"get_disclosure_scorecard","description":"Whether each equipment OEM publishes a dated lead-time schedule, list prices, backlog in dollars, capacity in units and delivery performance, scored yes, partia"},{"name":"get_record","description":"Every dated, checkable forecast Open Factory has made (lead times, prices, tariffs, power), the public series it is scored against, the date it resolves, and th"},{"name":"list_datasets","description":"The CSV files behind every chart Open Factory publishes, grouped by article, with direct download URLs. Each file keeps a source column naming the filing, tarif"},{"name":"get_tool_data","description":"The source table one Open Factory calculator runs on, with every input's provenance: copper-wire-price-sheet, genset-tco, interconnection-cost, lead-time-schedu"}],"toolCount":12,"toolsHash":"6f016a12c9b713c26f6b6a825fe7bf5e85d0dce39de496ac588992c8fd37cfb0","serverName":"open-factory","capabilities":["tools"],"serverVersion":"1.0.0","protocolVersion":"2025-06-18"}},{"at":"2026-10-23T20:23:58.844Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":86,"error":null,"detail":{"tools":[{"name":"search_articles","description":"Search Open Factory articles by topic, equipment class, company, tag or series ID. Returns the best matches with slug, URL, date, pillar, summary and the CSV fi"},{"name":"get_article","description":"Full metadata and the free text (markdown) of one Open Factory article by slug, with its cited sources and CSV files. Articles with a paywall return the text up"},{"name":"get_index_readings","description":"The current public headline number of every Open Factory model (lead time, build cost per MW, book-to-bill, OEM disclosure, energization year), each with its so"},{"name":"get_lead_times","description":"Current published lead time, in weeks, for factory and datacenter electrical equipment classes (transformers, switchgear, switchboards, MCC, busway, gensets, AT"},{"name":"get_price_bands","description":"Transaction price bands from public procurement awards: pad-mount and power transformers ($/kVA), MV switchgear, gensets ($/kW) and chillers ($/ton), with p25, "},{"name":"get_tariff_rates","description":"US import tariff for factory and datacenter equipment: 22 HTS lines (transformers, switchgear, gensets, chillers, machine tools, robots and parts) by origin cou"},{"name":"get_large_load_terms","description":"What a 50 MW or larger load pays to connect in fifteen US utilities and markets: study fee, security or collateral per MW, minimum bill, contract term, ramp, ex"},{"name":"get_book_to_bill","description":"Latest quarter orders, revenue, backlog, book-to-bill and backlog growth for the electrical, power and cooling OEMs (Eaton, GE Vernova, Siemens Energy, ABB, Sch"},{"name":"get_disclosure_scorecard","description":"Whether each equipment OEM publishes a dated lead-time schedule, list prices, backlog in dollars, capacity in units and delivery performance, scored yes, partia"},{"name":"get_record","description":"Every dated, checkable forecast Open Factory has made (lead times, prices, tariffs, power), the public series it is scored against, the date it resolves, and th"},{"name":"list_datasets","description":"The CSV files behind every chart Open Factory publishes, grouped by article, with direct download URLs. Each file keeps a source column naming the filing, tarif"},{"name":"get_tool_data","description":"The source table one Open Factory calculator runs on, with every input's provenance: copper-wire-price-sheet, genset-tco, interconnection-cost, lead-time-schedu"}],"toolCount":12,"toolsHash":"6f016a12c9b713c26f6b6a825fe7bf5e85d0dce39de496ac588992c8fd37cfb0","serverName":"open-factory","capabilities":["tools"],"serverVersion":"1.0.0","protocolVersion":"2025-06-18"}},{"at":"2026-10-23T13:28:47.652Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":84,"error":null,"detail":{"tools":[{"name":"search_articles","description":"Search Open Factory articles by topic, equipment class, company, tag or series ID. Returns the best matches with slug, URL, date, pillar, summary and the CSV fi"},{"name":"get_article","description":"Full metadata and the free text (markdown) of one Open Factory article by slug, with its cited sources and CSV files. Articles with a paywall return the text up"},{"name":"get_index_readings","description":"The current public headline number of every Open Factory model (lead time, build cost per MW, book-to-bill, OEM disclosure, energization year), each with its so"},{"name":"get_lead_times","description":"Current published lead time, in weeks, for factory and datacenter electrical equipment classes (transformers, switchgear, switchboards, MCC, busway, gensets, AT"},{"name":"get_price_bands","description":"Transaction price bands from public procurement awards: pad-mount and power transformers ($/kVA), MV switchgear, gensets ($/kW) and chillers ($/ton), with p25, "},{"name":"get_tariff_rates","description":"US import tariff for factory and datacenter equipment: 22 HTS lines (transformers, switchgear, gensets, chillers, machine tools, robots and parts) by origin cou"},{"name":"get_large_load_terms","description":"What a 50 MW or larger load pays to connect in fifteen US utilities and markets: study fee, security or collateral per MW, minimum bill, contract term, ramp, ex"},{"name":"get_book_to_bill","description":"Latest quarter orders, revenue, backlog, book-to-bill and backlog growth for the electrical, power and cooling OEMs (Eaton, GE Vernova, Siemens Energy, ABB, Sch"},{"name":"get_disclosure_scorecard","description":"Whether each equipment OEM publishes a dated lead-time schedule, list prices, backlog in dollars, capacity in units and delivery performance, scored yes, partia"},{"name":"get_record","description":"Every dated, checkable forecast Open Factory has made (lead times, prices, tariffs, power), the public series it is scored against, the date it resolves, and th"},{"name":"list_datasets","description":"The CSV files behind every chart Open Factory publishes, grouped by article, with direct download URLs. Each file keeps a source column naming the filing, tarif"},{"name":"get_tool_data","description":"The source table one Open Factory calculator runs on, with every input's provenance: copper-wire-price-sheet, genset-tco, interconnection-cost, lead-time-schedu"}],"toolCount":12,"toolsHash":"6f016a12c9b713c26f6b6a825fe7bf5e85d0dce39de496ac588992c8fd37cfb0","serverName":"open-factory","capabilities":["tools"],"serverVersion":"1.0.0","protocolVersion":"2025-06-18"}},{"at":"2026-10-23T06:27:52.984Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":80,"error":null,"detail":{"tools":[{"name":"search_articles","description":"Search Open Factory articles by topic, equipment class, company, tag or series ID. Returns the best matches with slug, URL, date, pillar, summary and the CSV fi"},{"name":"get_article","description":"Full metadata and the free text (markdown) of one Open Factory article by slug, with its cited sources and CSV files. Articles with a paywall return the text up"},{"name":"get_index_readings","description":"The current public headline number of every Open Factory model (lead time, build cost per MW, book-to-bill, OEM disclosure, energization year), each with its so"},{"name":"get_lead_times","description":"Current published lead time, in weeks, for factory and datacenter electrical equipment classes (transformers, switchgear, switchboards, MCC, busway, gensets, AT"},{"name":"get_price_bands","description":"Transaction price bands from public procurement awards: pad-mount and power transformers ($/kVA), MV switchgear, gensets ($/kW) and chillers ($/ton), with p25, "},{"name":"get_tariff_rates","description":"US import tariff for factory and datacenter equipment: 22 HTS lines (transformers, switchgear, gensets, chillers, machine tools, robots and parts) by origin cou"},{"name":"get_large_load_terms","description":"What a 50 MW or larger load pays to connect in fifteen US utilities and markets: study fee, security or collateral per MW, minimum bill, contract term, ramp, ex"},{"name":"get_book_to_bill","description":"Latest quarter orders, revenue, backlog, book-to-bill and backlog growth for the electrical, power and cooling OEMs (Eaton, GE Vernova, Siemens Energy, ABB, Sch"},{"name":"get_disclosure_scorecard","description":"Whether each equipment OEM publishes a dated lead-time schedule, list prices, backlog in dollars, capacity in units and delivery performance, scored yes, partia"},{"name":"get_record","description":"Every dated, checkable forecast Open Factory has made (lead times, prices, tariffs, power), the public series it is scored against, the date it resolves, and th"},{"name":"list_datasets","description":"The CSV files behind every chart Open Factory publishes, grouped by article, with direct download URLs. Each file keeps a source column naming the filing, tarif"},{"name":"get_tool_data","description":"The source table one Open Factory calculator runs on, with every input's provenance: copper-wire-price-sheet, genset-tco, interconnection-cost, lead-time-schedu"}],"toolCount":12,"toolsHash":"6f016a12c9b713c26f6b6a825fe7bf5e85d0dce39de496ac588992c8fd37cfb0","serverName":"open-factory","capabilities":["tools"],"serverVersion":"1.0.0","protocolVersion":"2025-06-18"}},{"at":"2026-10-23T00:31:42.032Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":76,"error":null,"detail":{"tools":[{"name":"search_articles","description":"Search Open Factory articles by topic, equipment class, company, tag or series ID. Returns the best matches with slug, URL, date, pillar, summary and the CSV fi"},{"name":"get_article","description":"Full metadata and the free text (markdown) of one Open Factory article by slug, with its cited sources and CSV files. Articles with a paywall return the text up"},{"name":"get_index_readings","description":"The current public headline number of every Open Factory model (lead time, build cost per MW, book-to-bill, OEM disclosure, energization year), each with its so"},{"name":"get_lead_times","description":"Current published lead time, in weeks, for factory and datacenter electrical equipment classes (transformers, switchgear, switchboards, MCC, busway, gensets, AT"},{"name":"get_price_bands","description":"Transaction price bands from public procurement awards: pad-mount and power transformers ($/kVA), MV switchgear, gensets ($/kW) and chillers ($/ton), with p25, "},{"name":"get_tariff_rates","description":"US import tariff for factory and datacenter equipment: 22 HTS lines (transformers, switchgear, gensets, chillers, machine tools, robots and parts) by origin cou"},{"name":"get_large_load_terms","description":"What a 50 MW or larger load pays to connect in fifteen US utilities and markets: study fee, security or collateral per MW, minimum bill, contract term, ramp, ex"},{"name":"get_book_to_bill","description":"Latest quarter orders, revenue, backlog, book-to-bill and backlog growth for the electrical, power and cooling OEMs (Eaton, GE Vernova, Siemens Energy, ABB, Sch"},{"name":"get_disclosure_scorecard","description":"Whether each equipment OEM publishes a dated lead-time schedule, list prices, backlog in dollars, capacity in units and delivery performance, scored yes, partia"},{"name":"get_record","description":"Every dated, checkable forecast Open Factory has made (lead times, prices, tariffs, power), the public series it is scored against, the date it resolves, and th"},{"name":"list_datasets","description":"The CSV files behind every chart Open Factory publishes, grouped by article, with direct download URLs. Each file keeps a source column naming the filing, tarif"},{"name":"get_tool_data","description":"The source table one Open Factory calculator runs on, with every input's provenance: copper-wire-price-sheet, genset-tco, interconnection-cost, lead-time-schedu"}],"toolCount":12,"toolsHash":"6f016a12c9b713c26f6b6a825fe7bf5e85d0dce39de496ac588992c8fd37cfb0","serverName":"open-factory","capabilities":["tools"],"serverVersion":"1.0.0","protocolVersion":"2025-06-18"}},{"at":"2026-10-22T18:31:42.977Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":175,"error":null,"detail":{"tools":[{"name":"search_articles","description":"Search Open Factory articles by topic, equipment class, company, tag or series ID. Returns the best matches with slug, URL, date, pillar, summary and the CSV fi"},{"name":"get_article","description":"Full metadata and the free text (markdown) of one Open Factory article by slug, with its cited sources and CSV files. Articles with a paywall return the text up"},{"name":"get_index_readings","description":"The current public headline number of every Open Factory model (lead time, build cost per MW, book-to-bill, OEM disclosure, energization year), each with its so"},{"name":"get_lead_times","description":"Current published lead time, in weeks, for factory and datacenter electrical equipment classes (transformers, switchgear, switchboards, MCC, busway, gensets, AT"},{"name":"get_price_bands","description":"Transaction price bands from public procurement awards: pad-mount and power transformers ($/kVA), MV switchgear, gensets ($/kW) and chillers ($/ton), with p25, "},{"name":"get_tariff_rates","description":"US import tariff for factory and datacenter equipment: 22 HTS lines (transformers, switchgear, gensets, chillers, machine tools, robots and parts) by origin cou"},{"name":"get_large_load_terms","description":"What a 50 MW or larger load pays to connect in fifteen US utilities and markets: study fee, security or collateral per MW, minimum bill, contract term, ramp, ex"},{"name":"get_book_to_bill","description":"Latest quarter orders, revenue, backlog, book-to-bill and backlog growth for the electrical, power and cooling OEMs (Eaton, GE Vernova, Siemens Energy, ABB, Sch"},{"name":"get_disclosure_scorecard","description":"Whether each equipment OEM publishes a dated lead-time schedule, list prices, backlog in dollars, capacity in units and delivery performance, scored yes, partia"},{"name":"get_record","description":"Every dated, checkable forecast Open Factory has made (lead times, prices, tariffs, power), the public series it is scored against, the date it resolves, and th"},{"name":"list_datasets","description":"The CSV files behind every chart Open Factory publishes, grouped by article, with direct download URLs. Each file keeps a source column naming the filing, tarif"},{"name":"get_tool_data","description":"The source table one Open Factory calculator runs on, with every input's provenance: copper-wire-price-sheet, genset-tco, interconnection-cost, lead-time-schedu"}],"toolCount":12,"toolsHash":"6f016a12c9b713c26f6b6a825fe7bf5e85d0dce39de496ac588992c8fd37cfb0","serverName":"open-factory","capabilities":["tools"],"serverVersion":"1.0.0","protocolVersion":"2025-06-18"}}],"tools":[{"name":"search_articles","description":"Search Open Factory articles by topic, equipment class, company, tag or series ID. Returns the best matches with slug, URL, date, pillar, summary and the CSV fi"},{"name":"get_article","description":"Full metadata and the free text (markdown) of one Open Factory article by slug, with its cited sources and CSV files. Articles with a paywall return the text up"},{"name":"get_index_readings","description":"The current public headline number of every Open Factory model (lead time, build cost per MW, book-to-bill, OEM disclosure, energization year), each with its so"},{"name":"get_lead_times","description":"Current published lead time, in weeks, for factory and datacenter electrical equipment classes (transformers, switchgear, switchboards, MCC, busway, gensets, AT"},{"name":"get_price_bands","description":"Transaction price bands from public procurement awards: pad-mount and power transformers ($/kVA), MV switchgear, gensets ($/kW) and chillers ($/ton), with p25, "},{"name":"get_tariff_rates","description":"US import tariff for factory and datacenter equipment: 22 HTS lines (transformers, switchgear, gensets, chillers, machine tools, robots and parts) by origin cou"},{"name":"get_large_load_terms","description":"What a 50 MW or larger load pays to connect in fifteen US utilities and markets: study fee, security or collateral per MW, minimum bill, contract term, ramp, ex"},{"name":"get_book_to_bill","description":"Latest quarter orders, revenue, backlog, book-to-bill and backlog growth for the electrical, power and cooling OEMs (Eaton, GE Vernova, Siemens Energy, ABB, Sch"},{"name":"get_disclosure_scorecard","description":"Whether each equipment OEM publishes a dated lead-time schedule, list prices, backlog in dollars, capacity in units and delivery performance, scored yes, partia"},{"name":"get_record","description":"Every dated, checkable forecast Open Factory has made (lead times, prices, tariffs, power), the public series it is scored against, the date it resolves, and th"},{"name":"list_datasets","description":"The CSV files behind every chart Open Factory publishes, grouped by article, with direct download URLs. Each file keeps a source column naming the filing, tarif"},{"name":"get_tool_data","description":"The source table one Open Factory calculator runs on, with every input's provenance: copper-wire-price-sheet, genset-tco, interconnection-cost, lead-time-schedu"}],"package":null,"toolSurface":{"id":"ts_3h7n3ckktu4b","endpointId":"ep_gh6dkpnpesnc","hash":"6f016a12c9b713c26f6b6a825fe7bf5e85d0dce39de496ac588992c8fd37cfb0","toolCount":12,"serverName":"open-factory","serverVersion":"1.0.0","protocolVersion":"2025-06-18","firstSeenAt":"2026-10-18T09:30:04.641Z","lastSeenAt":"2026-10-25T07:25:42.663Z","observations":25,"toolNames":["search_articles","get_article","get_index_readings","get_lead_times","get_price_bands","get_tariff_rates","get_large_load_terms","get_book_to_bill","get_disclosure_scorecard","get_record","list_datasets","get_tool_data"],"distinctSurfaces":1},"endpointFacts":[{"id":"ep_gh6dkpnpesnc","url":"https://open-factory.com/mcp","type":"mcp_streamable_http","factsCheckedAt":"2026-10-20T15:29:28.541Z","auth":{"observedAt":"2026-10-20T15:29:28.650Z","authRequired":false,"scheme":null,"resourceMetadata":null,"authorizationServer":null,"conformance":{"dpop":false,"rfc8414":false,"rfc9728":false,"pkceS256":false,"clientIdMetadataDocument":false,"dynamicClientRegistration":false}},"tls":{"observedAt":"2026-10-20T15:29:28.695Z","protocol":"TLSv1.3","chainValid":true,"chainError":null,"hostMatches":true,"subject":"open-factory.com","issuer":{"commonName":"WE1","organization":"Google Trust Services"},"validFrom":"2026-09-16T03:07:12.000Z","validTo":"2026-12-15T04:07:09.000Z","daysToExpiry":50,"sanCount":1,"fingerprint256":"B1:20:23:0B:9E:25:61:9C:E6:D9:6E:74:DC:77:08:CC:E5:94:28:C3:34:CC:27:42:1D:0D:E8:E9:25:97:41:FE"}}]},"verification":{"claimed":false,"claimedAt":null,"proofs":[]},"provenance":{"sources":[{"source":"mcp_registry","key":"com.open-factory/open-factory","url":"https://registry.modelcontextprotocol.io/v0/servers/com.open-factory%2Fopen-factory","firstSeenAt":"2026-10-18T09:22:16.629Z","fetchedAt":"2026-10-25T08:18:49.961Z","normalizedAt":"2026-10-25T08:18:49.961Z"}]},"firstSeenAt":"2026-10-18T09:22:16.629Z","updatedAt":"2026-10-25T07:27:46.364Z"}