{"$schema":"https://wellknown.network/schemas/agent-record-v1.json","schemaVersion":"1","id":"ag_5juvd6e3ax5c","handle":"costable-parametric-should-cost-analysis","url":"https://wellknown.network/agents/costable-parametric-should-cost-analysis","links":{"self":"https://wellknown.network/agents/costable-parametric-should-cost-analysis/record.json","html":"https://wellknown.network/agents/costable-parametric-should-cost-analysis","markdown":"https://wellknown.network/agents/costable-parametric-should-cost-analysis/record.md","api":"https://wellknown.network/api/v1/agents/costable-parametric-should-cost-analysis","status":"https://wellknown.network/api/v1/agents/costable-parametric-should-cost-analysis/status","claim":"https://wellknown.network/agents/costable-parametric-should-cost-analysis/claim","claimApi":"https://wellknown.network/api/v1/claims","claimDescriptor":"https://wellknown.network/agents/costable-parametric-should-cost-analysis/claim.json","badge":"https://wellknown.network/agents/costable-parametric-should-cost-analysis/badge.svg","openapi":"https://wellknown.network/openapi.json"},"ard":{"identifier":"urn:air:costable.ai:server:costable-parametric-should-cost-analysis","type":"application/mcp-server-card+json"},"kind":"mcp_server","declared":{"name":"Costable — Parametric Should-Cost Analysis","summary":"Parametric should-cost: P50/P80/P90 estimates, 801 materials, 25 countries, quote review.","description":"Parametric should-cost: P50/P80/P90 estimates, 801 materials, 25 countries, quote review.","publisher":{"name":"1337mofo","url":null},"homepage":null,"repository":null,"version":"1.0.0","license":null,"protocols":["mcp"],"tags":[],"pricing":null,"endpoints":[{"url":"https://costable.ai/api/mcp","type":"mcp_streamable_http","auth":null,"probeable":true}],"skills":null,"tools":null,"extra":{"updatedAt":"2026-08-22T10:09:09.629895Z","publishedAt":"2026-08-22T10:09:09.629895Z","registryName":"io.github.1337mofo/costable"},"attribution":{"kind":"mcp_registry","name":"mcp_registry","summary":"mcp_registry","version":"mcp_registry","description":"mcp_registry","publisherName":"mcp_registry"}},"derived":{"capabilities":[{"slug":"data.database","name":"Databases","confidence":1,"provenance":"derived"},{"slug":"commerce.pricing","name":"Pricing & Quotes","confidence":1,"provenance":"derived"},{"slug":"code.review","name":"Code Review","confidence":0.885,"provenance":"derived"},{"slug":"ai.evaluation","name":"Evaluation & Benchmarks","confidence":0.54,"provenance":"derived"}],"categories":["ai","code","commerce","data"]},"observed":{"status":"live","statusReason":"Responded 29h ago.","lastOkAt":"2026-09-06T02:27:54.313Z","lastProbedAt":"2026-09-06T02:27:54.313Z","statusComputedAt":"2026-09-06T02:28:29.678Z","reliability30d":{"probes":1,"successRate":1,"p50Ms":387},"latestObservations":[{"at":"2026-09-07T05:22:54.416Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":432,"error":null,"detail":{"tools":[{"name":"estimate_part","description":"Instantly estimate the should-cost of a manufactured part using natural language. Returns P50 (median), P80 and P90 cost-at-risk per unit based on Monte Carlo s"},{"name":"search_materials","description":"Search the Costable materials database (37 materials with LME-sourced pricing). Returns material name, category, price per kg, density, and strength properties."},{"name":"search_processes","description":"Search the Costable manufacturing process database (41 processes). Returns process name, category, machine rate ($/hr), and cycle time model."},{"name":"get_labour_rates","description":"Get manufacturing labour rates ($/hr) for all skill levels in a given country. Data covers 16 skill levels across 25 countries (ILO/BLS/ABS sourced)."},{"name":"create_cost_model","description":"Create a new parametric cost model in Costable. Returns the model ID which is used by add_material_to_model, add_process_to_model, calculate_cost_model, and com"},{"name":"add_material_to_model","description":"Add a material (BOM line) to an existing cost model. Searches the materials database by name query — no need for exact IDs."},{"name":"add_process_to_model","description":"Add a manufacturing process step to an existing cost model. Searches the process database by name query — no need for exact IDs."},{"name":"calculate_cost_model","description":"Run the Monte Carlo should-cost calculation on a cost model. Returns P50 (median), P80 and P90 cost-at-risk per unit, plus a full cost breakdown (material, labo"},{"name":"compare_manufacturing_countries","description":"Run the cost model across multiple manufacturing countries simultaneously to identify the optimal sourcing location. Returns P50/P80/P90 per country and % delta"},{"name":"review_supplier_quote","description":"Analyse a supplier quote against Costable's should-cost benchmarks. Returns a line-by-line delta (% over/under should-cost), verdict (LOW / COMPETITIVE / HIGH /"}],"toolCount":10,"serverName":"costable","capabilities":["tools"],"serverVersion":"1.0.0","protocolVersion":"2024-11-05"}},{"at":"2026-09-06T23:22:31.711Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":1889,"error":null,"detail":{"tools":[{"name":"estimate_part","description":"Instantly estimate the should-cost of a manufactured part using natural language. Returns P50 (median), P80 and P90 cost-at-risk per unit based on Monte Carlo s"},{"name":"search_materials","description":"Search the Costable materials database (37 materials with LME-sourced pricing). Returns material name, category, price per kg, density, and strength properties."},{"name":"search_processes","description":"Search the Costable manufacturing process database (41 processes). Returns process name, category, machine rate ($/hr), and cycle time model."},{"name":"get_labour_rates","description":"Get manufacturing labour rates ($/hr) for all skill levels in a given country. Data covers 16 skill levels across 25 countries (ILO/BLS/ABS sourced)."},{"name":"create_cost_model","description":"Create a new parametric cost model in Costable. Returns the model ID which is used by add_material_to_model, add_process_to_model, calculate_cost_model, and com"},{"name":"add_material_to_model","description":"Add a material (BOM line) to an existing cost model. Searches the materials database by name query — no need for exact IDs."},{"name":"add_process_to_model","description":"Add a manufacturing process step to an existing cost model. Searches the process database by name query — no need for exact IDs."},{"name":"calculate_cost_model","description":"Run the Monte Carlo should-cost calculation on a cost model. Returns P50 (median), P80 and P90 cost-at-risk per unit, plus a full cost breakdown (material, labo"},{"name":"compare_manufacturing_countries","description":"Run the cost model across multiple manufacturing countries simultaneously to identify the optimal sourcing location. Returns P50/P80/P90 per country and % delta"},{"name":"review_supplier_quote","description":"Analyse a supplier quote against Costable's should-cost benchmarks. Returns a line-by-line delta (% over/under should-cost), verdict (LOW / COMPETITIVE / HIGH /"}],"toolCount":10,"serverName":"costable","capabilities":["tools"],"serverVersion":"1.0.0","protocolVersion":"2024-11-05"}},{"at":"2026-09-06T17:28:45.059Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":432,"error":null,"detail":{"tools":[{"name":"estimate_part","description":"Instantly estimate the should-cost of a manufactured part using natural language. Returns P50 (median), P80 and P90 cost-at-risk per unit based on Monte Carlo s"},{"name":"search_materials","description":"Search the Costable materials database (37 materials with LME-sourced pricing). Returns material name, category, price per kg, density, and strength properties."},{"name":"search_processes","description":"Search the Costable manufacturing process database (41 processes). Returns process name, category, machine rate ($/hr), and cycle time model."},{"name":"get_labour_rates","description":"Get manufacturing labour rates ($/hr) for all skill levels in a given country. Data covers 16 skill levels across 25 countries (ILO/BLS/ABS sourced)."},{"name":"create_cost_model","description":"Create a new parametric cost model in Costable. Returns the model ID which is used by add_material_to_model, add_process_to_model, calculate_cost_model, and com"},{"name":"add_material_to_model","description":"Add a material (BOM line) to an existing cost model. Searches the materials database by name query — no need for exact IDs."},{"name":"add_process_to_model","description":"Add a manufacturing process step to an existing cost model. Searches the process database by name query — no need for exact IDs."},{"name":"calculate_cost_model","description":"Run the Monte Carlo should-cost calculation on a cost model. Returns P50 (median), P80 and P90 cost-at-risk per unit, plus a full cost breakdown (material, labo"},{"name":"compare_manufacturing_countries","description":"Run the cost model across multiple manufacturing countries simultaneously to identify the optimal sourcing location. Returns P50/P80/P90 per country and % delta"},{"name":"review_supplier_quote","description":"Analyse a supplier quote against Costable's should-cost benchmarks. Returns a line-by-line delta (% over/under should-cost), verdict (LOW / COMPETITIVE / HIGH /"}],"toolCount":10,"serverName":"costable","capabilities":["tools"],"serverVersion":"1.0.0","protocolVersion":"2024-11-05"}},{"at":"2026-09-06T10:26:22.726Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":385,"error":null,"detail":{"tools":[{"name":"estimate_part","description":"Instantly estimate the should-cost of a manufactured part using natural language. Returns P50 (median), P80 and P90 cost-at-risk per unit based on Monte Carlo s"},{"name":"search_materials","description":"Search the Costable materials database (37 materials with LME-sourced pricing). Returns material name, category, price per kg, density, and strength properties."},{"name":"search_processes","description":"Search the Costable manufacturing process database (41 processes). Returns process name, category, machine rate ($/hr), and cycle time model."},{"name":"get_labour_rates","description":"Get manufacturing labour rates ($/hr) for all skill levels in a given country. Data covers 16 skill levels across 25 countries (ILO/BLS/ABS sourced)."},{"name":"create_cost_model","description":"Create a new parametric cost model in Costable. Returns the model ID which is used by add_material_to_model, add_process_to_model, calculate_cost_model, and com"},{"name":"add_material_to_model","description":"Add a material (BOM line) to an existing cost model. Searches the materials database by name query — no need for exact IDs."},{"name":"add_process_to_model","description":"Add a manufacturing process step to an existing cost model. Searches the process database by name query — no need for exact IDs."},{"name":"calculate_cost_model","description":"Run the Monte Carlo should-cost calculation on a cost model. Returns P50 (median), P80 and P90 cost-at-risk per unit, plus a full cost breakdown (material, labo"},{"name":"compare_manufacturing_countries","description":"Run the cost model across multiple manufacturing countries simultaneously to identify the optimal sourcing location. Returns P50/P80/P90 per country and % delta"},{"name":"review_supplier_quote","description":"Analyse a supplier quote against Costable's should-cost benchmarks. Returns a line-by-line delta (% over/under should-cost), verdict (LOW / COMPETITIVE / HIGH /"}],"toolCount":10,"serverName":"costable","capabilities":["tools"],"serverVersion":"1.0.0","protocolVersion":"2024-11-05"}},{"at":"2026-09-06T02:27:54.313Z","kind":"mcp_initialize","ok":true,"httpStatus":200,"latencyMs":387,"error":null,"detail":{"tools":[{"name":"estimate_part","description":"Instantly estimate the should-cost of a manufactured part using natural language. Returns P50 (median), P80 and P90 cost-at-risk per unit based on Monte Carlo s"},{"name":"search_materials","description":"Search the Costable materials database (37 materials with LME-sourced pricing). Returns material name, category, price per kg, density, and strength properties."},{"name":"search_processes","description":"Search the Costable manufacturing process database (41 processes). Returns process name, category, machine rate ($/hr), and cycle time model."},{"name":"get_labour_rates","description":"Get manufacturing labour rates ($/hr) for all skill levels in a given country. Data covers 16 skill levels across 25 countries (ILO/BLS/ABS sourced)."},{"name":"create_cost_model","description":"Create a new parametric cost model in Costable. Returns the model ID which is used by add_material_to_model, add_process_to_model, calculate_cost_model, and com"},{"name":"add_material_to_model","description":"Add a material (BOM line) to an existing cost model. Searches the materials database by name query — no need for exact IDs."},{"name":"add_process_to_model","description":"Add a manufacturing process step to an existing cost model. Searches the process database by name query — no need for exact IDs."},{"name":"calculate_cost_model","description":"Run the Monte Carlo should-cost calculation on a cost model. Returns P50 (median), P80 and P90 cost-at-risk per unit, plus a full cost breakdown (material, labo"},{"name":"compare_manufacturing_countries","description":"Run the cost model across multiple manufacturing countries simultaneously to identify the optimal sourcing location. Returns P50/P80/P90 per country and % delta"},{"name":"review_supplier_quote","description":"Analyse a supplier quote against Costable's should-cost benchmarks. Returns a line-by-line delta (% over/under should-cost), verdict (LOW / COMPETITIVE / HIGH /"}],"toolCount":10,"serverName":"costable","capabilities":["tools"],"serverVersion":"1.0.0","protocolVersion":"2024-11-05"}}],"tools":[{"name":"estimate_part","description":"Instantly estimate the should-cost of a manufactured part using natural language. Returns P50 (median), P80 and P90 cost-at-risk per unit based on Monte Carlo s"},{"name":"search_materials","description":"Search the Costable materials database (37 materials with LME-sourced pricing). Returns material name, category, price per kg, density, and strength properties."},{"name":"search_processes","description":"Search the Costable manufacturing process database (41 processes). Returns process name, category, machine rate ($/hr), and cycle time model."},{"name":"get_labour_rates","description":"Get manufacturing labour rates ($/hr) for all skill levels in a given country. Data covers 16 skill levels across 25 countries (ILO/BLS/ABS sourced)."},{"name":"create_cost_model","description":"Create a new parametric cost model in Costable. Returns the model ID which is used by add_material_to_model, add_process_to_model, calculate_cost_model, and com"},{"name":"add_material_to_model","description":"Add a material (BOM line) to an existing cost model. Searches the materials database by name query — no need for exact IDs."},{"name":"add_process_to_model","description":"Add a manufacturing process step to an existing cost model. Searches the process database by name query — no need for exact IDs."},{"name":"calculate_cost_model","description":"Run the Monte Carlo should-cost calculation on a cost model. Returns P50 (median), P80 and P90 cost-at-risk per unit, plus a full cost breakdown (material, labo"},{"name":"compare_manufacturing_countries","description":"Run the cost model across multiple manufacturing countries simultaneously to identify the optimal sourcing location. Returns P50/P80/P90 per country and % delta"},{"name":"review_supplier_quote","description":"Analyse a supplier quote against Costable's should-cost benchmarks. Returns a line-by-line delta (% over/under should-cost), verdict (LOW / COMPETITIVE / HIGH /"}],"package":null},"verification":{"claimed":false,"claimedAt":null,"proofs":[]},"provenance":{"sources":[{"source":"mcp_registry","key":"io.github.1337mofo/costable","url":"https://registry.modelcontextprotocol.io/v0/servers/io.github.1337mofo%2Fcostable","firstSeenAt":"2026-09-06T00:20:39.117Z","fetchedAt":"2026-09-06T00:20:39.117Z","normalizedAt":"2026-09-06T00:20:39.117Z"}]},"firstSeenAt":"2026-09-06T00:20:39.117Z","updatedAt":"2026-09-06T02:28:38.215Z"}